4.5. Functionality Test 

 

Burner functionality is checked with the help of the following sequence of actions

:

 

– visual review in order to make sure there are no any mechanical defects, impurities, 

then check fasteners and connecting wires for reliability; 

CAUTION! 

If required, replace damaged parts or send for repair, remove dust, 

impurities, screw attaching bolts as well as connecting ports. 

– connect the burner to the control unit; 

– when in manual mode, check operation of the internal screw, fan, and the heating 

element; 

– 

make  sure  there  are  no  abnormal  noises,  sounds,  etc.  the  internal  s

crew rotates 

anti clockwise, the fan is operated within the full range from 1% to 99%; 

– if there are any discrepancies you shall get a hold of the service center and invite 

the specialist

.

 

CAUTION! 

The 

heating

 element shall be tested with the fan running only

 

4.6. Engineering Certification 

 

The procedure, scope, and periodicity of the engineering certification of the product 

and its components are in accordance with the current normative documents

.

 

 

4.7. Storage Instructions  

 

The burner and its components shall be stored indoors or under the shelter excluding 

direct  atmospheric  precipitation.  Spare  parts  shall  be  stored  in  the  closed  premises.

  The 

burner is delivered from the manufacturing plant after the preservation with the duration of 

protective coatings of 12 m

onths. 

At the end of the effective period of preservation of the 

manufacturing plant or on long storage (more than 6 months) the burner shall be put into 

long-

term  storage.  All  unpainted  surfaces  shall  be  coated  with  anti

-

corrosion  grease. 

Preservation  shall  be  carried  out  at a temperature of not lower than 

+15  °С

  and relative 

humidity not exceeding 

70 %. 

The units arriving for preservation shall be free of corrosion 

damage to the metal and without damage to the paint and varnish coatings.

 Surfaces that 

are 

subject to preservation shall be cleaned, degreased, and dried. 

Lubricants required for 

preservation shall 

be consistent with those for the specified shelf life.

  

Depreservation is carried out by 

washing off the preservative coating.

 

 

5. CURRENT REPAIR 

 

5.1. General Instructions 

 

Normal  operation  of  the  burner  requires only routine maintenance, cleaning, and 

implementation  of  the  necessary  inspections.  However

,  sometimes there are cases of 

irregularities  in  the  proper  operation  of  the  boiler  and  the  burner. 

  During the initial 

operational period this is mainly caused by inability to properly operate the controller and the 

boiler. But there are also problems for technical reasons. 

Below are the possible failures and 

troubleshooting methods. 

 

Содержание AIR PELLET 60 kW

Страница 1: ...AIR PELLET 60 kW FLARE PELLET BURNER Operation Manual СВ 060 00 00СК ...

Страница 2: ...tup of the Boiler with the Burner 11 3 4 Burner Stop 11 3 5 Actions in Emergency Situations 11 4 TECHNICAL MAINTENANCE 12 4 1 General Instructions 12 4 2 Safety Measures 12 4 3 Burner Maintenance Procedure 13 4 4 Current Maintenance 13 4 3 1 Periodic Technical Maintenance 14 4 5 Functionality Test 15 4 6 Engineering Certification 15 4 7 Storage Instructions 15 5 CURRENT REPAIR 15 5 1 General Instr...

Страница 3: ...peration Manual Individuals authorized to operate and take care of AIR PELLET 60 kW burner shall follow this Operation Manual Due to continuous enhancement of the structure construction of Air Pellet flare pellet burners as well as their manufacturing technology this Operation Manual might contain some discrepancies in terms of description of the product unit and the unit itself and such discrepan...

Страница 4: ...PERATION 1 1 Purpose Burners of AIR PELLET 60 KW type Picture 1 are intended for burning wood fuel pellets in water heating boilers with a nominal heat output of up to 60 kW Picture 1 Overall and mounting dimensions of the burner ...

Страница 5: ...ed to install the fan exhauster to remove burnt gases the boiler house where the burner is installed shall correspond with all the acting local norms and rules the boiler shall be located in such a way to ensure enough room for cleaning the burner and removing ash from the boiler and the chimney If the flue gas temperature at the boiler outlet is less than 120 C there is a risk of condensation of ...

Страница 6: ...from inverted flame With the help of the mounting kit the screw feeder is fastened to the wall bunker or ceiling depending on installation area conditions Picture 3 shows correct location of the screw feeder towards the horizon and the burner It is necessary to meet the following recommendations during installation and operation process pellet intake hole shall be located upward vertically and not...

Страница 7: ... gear for furnace grates pressurized air fan electric system The burner housing is the basic unit also serving as the base for the equipment installed inside including the trailing furnace grates and the ignition system The combustion chamber has the air injection holes inside Their diameter is selected in such a way to ensure the open air flow makes possible the optimal air dosing in the volume r...

Страница 8: ...e grate module 2 movable grate bars 3 screw feeder of pellet supply 4 heating elements of the ignition system 5 refractory lining CAUTION The manufacturer reserves the right to incorporate changes into the design configuration and software of the burner Due to frequent upgrade of the product some of presented below examples may insignificantly vary from the reality and this fact however does not i...

Страница 9: ...the boiler Once the boiler reaches the preset temperature the controller will automatically switch off the burner In addition the controller plays a very important informational role displaying boiler operation parameters as well as some emergency situations Servicing of the boiler and the burner is quite power operated but however it does not mean that the user is free from monitoring the instruc...

Страница 10: ...g holes located on the burner Picture 6 If required installation can be carried out using adapter flange as well as with use of noncombustible sealant material Picture 6 Burner Installation CAUTION If there is a mounting seat stipulated by the manufacturing plant then the burner is installed on it in accordance with the documents delivered along with equipment 3 BURNER OPERATION 3 1 Operating Rest...

Страница 11: ... temperature on valves and radiator thermostats close all boiler s doors and covers of fuel tanks switch on power supply for the burner and the controller the further sequence of startup operation depends on the control system modification and is described in detail in the Instruction for the control system CAUTION The method of programming the controller and its service is described in the Instru...

Страница 12: ...umentation It is prohibited to use the burner with a faulty seal of the mounting plate In case of smelling carbon monoxide from the outside of the boiler it is required to immediately turn off the burner and restore the tightness of the seal If it is necessary to carry out work inside the boiler always turn off the burner and wait for about 20 minutes to ventilate and cool off the combustion chamb...

Страница 13: ...a defective burner or the burner with faulty equipment Re commissioning of the burner is allowed after troubleshooting Information and warning signs are placed on the whole system of the boiler with the burner During the operation of the boiler with the burner always follow the principle of limited confidence and carefully monitor the readings of the installed measuring and recording equipment CAU...

Страница 14: ...eating elements of the ignition system Check clean and tighten the sensor connections Check the fastening of the screw feeder clean the feed openings and evaluate the correct operation of these units Check the cooling system of the burner If leakage is detected at the joints they shall be fixed Clean the controller with a vacuum cleaner and check the operation of all its working functions Eliminat...

Страница 15: ...red in the closed premises The burner is delivered from the manufacturing plant after the preservation with the duration of protective coatings of 12 months At the end of the effective period of preservation of the manufacturing plant or on long storage more than 6 months the burner shall be put into long term storage All unpainted surfaces shall be coated with anti corrosion grease Preservation s...

Страница 16: ...iring contacts on gearbox and burner connector Boiler overheat overheat detector light is ON on the controller panel Rise of maximum temperature for heat carrier heating up in central heating circuit 1 Press Stop button on the controller 2 Let the boiler get cold 3 Define the reason for overheat and take measures to eliminate it Damage of temperature sensor Damage in chain of the heat carrier temp...

Страница 17: ...ose within the period exceeding 12 months Their storage location shall meet the following requirements on shelves only in the original factory and labeled boxes only in dry closed and ventilated premises in rooms at a temperature of 5 40 C and humidity not exceeding 50 in premises free of aggressive materials or chemical agents CAUTION It is forbidden to store or stockpile the products in the open...

Страница 18: ...rner into operation and adjustment of burner operation parameters have been carried out by the authorized representative of the manufacturing plant Warranty does not cover defects occurred through user s fault due to improper assembling of the burner user s fault due to violation of operation rules for the burner and the boiler lack of reasonable diligence loss of burner s delivery set items willf...

Страница 19: ...taller Name and Signature Name _ Tel _ City _ Street House ___________ For all issues relating to warranty and post warranty service please feel free to contact us at the address of 126 1 Plekhanovskaya Str Kharkov city 61037 Ukraine Telephone of Service Center 38 095 654 67 19 38 098 232 52 15 http bioprom ua Е mail no12service bioprom com ua ...

Страница 20: ..._____________________ License ____________ Expert ________________ Repair date _________________ stamp Record on warranty repair Defect description ______________________________________________________ Reason for failure _______________________________________________________ ______________________________________________________________________ Repair work performed _____________________________...

Страница 21: ...21 TICKET OF PUTTING INTO OPERATION Burner Model ID Date of Purchase Date of Installation User Details Name tel e mail Detailed info of the company that performed installation ...

Страница 22: ...22 FOR NOTES ...

Страница 23: ...23 FOR NOTES ...

Страница 24: ...24 LTD Bioprom Company Kharkov 126 1 Plekhanovskaya Str Kharkov Region Kharkov Ukraine tel 380 57 757 68 33 Email info bioprom com ua www bioprom ua www bioprom com ua www bioprom kh ua ...

Отзывы: