13
feeder).
– The electrical system of the whole complex of the boiler with the screw feeder and
the burner shall have an effective protection system ("grounding / zero
").
Sockets of all used
electrical connections must have a "zero" contact
.
– It is prohibited to store flammable and explosive materials and liquids in the
immediate vicinity from the operating burner.
– Always follow the controller’s instructions correctly and properly
.
Especially in case
of "emergency situation" appearance and alarm
.
In such a case the procedure for
extinguishing the boiler (the burner) should be immediately applied, and the switched off
boiler shall be marked with the plate "FAULTY – DO NOT SWITCH ON"
.
CAUTION!
Methods of behavior in emergency situations were described in a
separate section of this Manual.
– Protection against flame ingress into the screw feeder and the bunker is an elastic
polyurethane pipe provided by the manufacturer of the burner.
Having overheated the pipe
melts what results in displacement of the hole and the cut-off of the pellet feed into the
burner. This is an effective form of protection against fires in fuel.
It is forbidden to use
substitutes of the above mentioned pipe
.
– It is strictly forbidden to use a defective burner or the burner with faulty equipment
.
Re-commissioning of the burner is allowed after troubleshooting
.
– Information and warning signs are placed on the whole system of the boiler with the
burner
.
– During the operation of the boiler with the burner, always follow the principle of
“limited confidence” and carefully monitor the readings of the installed measuring-and-
recording
equipment.
CAUTION!
The information that is displayed on the controller
is very much
important.
– All technical devices that are part of the boiler and the burner system shall undergo
a systematic technical inspection to the extent required by the acting normative documents.
This requirement is a guarantee
for the safe use of these devices.
– In each emergency situation, immediately turn off the burner and the boiler, and
mark with the plate "FAULTY – DO NOT SWITCH ON"
.
– Each such a situation shall be reported to the relevant services of the enterprise
that are obliged to respond to the situation.
4.3. Burner Maintenance Procedure
The burner
maintenance procedure includes two main phases:
– current maintenance;
– periodic technical maintenance
.
4.4. Current Maintenance
The current maintenance includes the system of the following measures and actions
:
– to keep the complex of the boiler – the burner – the screw feeder – the bunker, as
well as the installed equipment properly clean;
– current removal of contaminants in the burner nozzle;