Mounting
1. Installation
Foundation
To accept the maximum pressure load a proper foundation must be provided by the customer. The luminaire is mounted in a recess
housing made of high-strength aluminium profile. The pressure load is transferred to the foundation by this housing. Foundation to be
provided at site. The foundation mus be carried out on firm subgrade. In order to optain a firm stableness, the recess housing must be
firmly concreted in. During preperation of the foundation proper drainage must be provided, so that entering surface water can drain off.
The lacquering of the recess housing must not be damaged.
Soil condition
The luminaire must not permanently have contact with aggressive media. Aggressive media might be washed out of the soil and might
corrode the housing of the luminaire. In case of an unknown composition of the soil a soil analysis schould be made before installation.
Aggressive media that is outgoing from the ground surface might also affect the luminaire. Thus an overuse of de-icing agents in the
surroundings should be avoided. Parasitic curren, occuring from outside, which is conducted by the luminaire into the soil, will cause
corrosion damage. Suitable counter measures must be carried out.
www.biontechnologies.com | 7
Содержание tellus point round xs
Страница 1: ...tellus point round xs pureWhite USER MANUAL BEDIENUNGSANLEITUNG www biontechnologies com ...
Страница 6: ...Load Table Load Table 230 V 230 V B10 B16 C10 C16 tellus point round 17 29 6 www biontechnologies com ...
Страница 8: ...2 Drainage system 8 www biontechnologies com ...
Страница 19: ...Lasttabelle Lasttabelle 230 V 230 V B10 B16 C10 C16 tellus point round 17 29 www biontechnologies com 19 ...
Страница 21: ...2 Drainagesystem www biontechnologies com 21 ...