5
Assembly
1
. Set the toilet in position against the wall.
The floor must be even and
insulated.
2. Measure and make a hole for the ventilation
pipe in the ceiling, 55 mm (2
1
/
4
”) diameter. Install
the ventilation pipe with the non-sleeved end
down inside the rubber coupling on the toilet.
3. Measure and make a hole in the roof,
with 55 mm (2
1
/
4
”) diameter.
4. Push the pipe up through the hole. Seal it well
using asphalt sealant between the pipe and the
roof to prevent any leaks.
5. Insulate the pipe from the ceiling up to the top.
All pipework in cold spaces must be insulated.
6. Cut the exterior pipe to fit the angle of the roof.
7. Place the roof flashing on to the exterior
pipe. (Use soapy water to make it easier).
If you have a tin roof, the best thing to do
is to get a sheet metal worker to make
a junction between the roof and the
exterior pipe.
8. Pass the exterior pipe over the ventilation
pipe's insulation. Put on the reduction
coupling.
9. Adjust the roof flashing and seal firmly with
asphalt sealant between the roof flasing and
the roof.
1
0.Fit the insect netting against the stop on the
reducing coupling.
Starting of empty toilet
1. Put about 2/3 of the bag of the BioLet humus starter into the toilet, except to model 65a where the whole
bag should be used. About half of the material falls directly through the grate into humus tray.
2. Connect the plug into a grounded wall socket. Push down and release the seat. The mixer motor will
automatically start and make one turn, repeat this a couple of times.
3. Set the heating control to the desired level. It's recommneded to start with setting #2.
18° C /
Vent
25 mm (1”) Insulation
Pipe 110 mm (4
1
/
2
”)
Reducing coupling
Insect netting
Roof flashing
25 mm Insulation
Ventilation pipe
Radiator
55mm (2
1
/
4
”)
Wall bracket
65° F
Non-sleeved end
Sleeved end
Roof flashing
seal of asphalt
Roof
Содержание 65a
Страница 1: ...User Manual for BioLet...
Страница 2: ......