INSTALLATION

You will need the following:

– Hole saw 55 mm (2

1

/

4

”) or jigsaw

– Saw

– Measuring tape 

– Asphalt sealant/adhesives

Also, check the floor space where the toilet should be placed so it is large enough. Required floor space is: 

BioLet 15a and 25a width 55 cm (21

1

/

2

”) x length 110 cm (43”)

BioLet 65a width 65 cm (25

1

/

2

”)x length 135 cm (53”) (for the toilet and room for removal of the tray) 

Pipe installation

The entire pipe, from ceiling and up through cold areas such as attic, must be insulated. This is to prevent 

condensation in the ventilation pipe and to increase natural draught. Insulation is essential, no matter how much 

or little the toilet is used, even if the toilet is used only in summer. 

Do not use bends more than 45°. 

Do not use any rain cap on top of the ventialtion pipe, only use the included netting. 

Overflow drain

If you choose to connect the emergency overflow drain, choose one of the connectors (9), depending on the 

direction of the hose. There is a silicone plug in the connector, push the plug into the toilet and connect the hose.

Temperature

The room in which the toilet is installed must be insulated. When the toilet is in use, room temperature 

should be at least 18°C (65°F) to ensure proper function. The best thing to do is to install a thermostatically 

controlled heating element. 

During periods when the toilet is not in use the temperature in the

room can be low or even freezing without any damage to the unit.

Air supply

To ensure adequate air supply, a vent through the outer wall should be installed. 

(100 mm (4”).  No extractor fan in the toilet room to avoid back drought, which can lead to odors in the room.

Содержание 65a

Страница 1: ...User Manual for BioLet...

Страница 2: ......

Страница 3: ...in Sweden and the brand is BioLet BioLet means that it produces natural humus in the actual unit without the use of water or chemicals Our largest model BioLet 65a has been awarded the Nordic ecolabe...

Страница 4: ...e power off and put the cover in the seat opening otherwise the compost will become dry The heating element in the room can also be switched off the composting toilet will not be damaged by freezing C...

Страница 5: ...tion optional The installation package contains 2 x 45 elbows 55 mm 21 4 Insulation 675 mm 27 inside and outside cover 2 pcs x exterior pipe 45 2 pcs x Insulation 55 mm 21 4 675 mm 27 exterior pipe 11...

Страница 6: ...e than 45 Do not use any rain cap on top of the ventialtion pipe only use the included netting Overflow drain If you choose to connect the emergency overflow drain choose one of the connectors 9 depen...

Страница 7: ...he roof and the exterior pipe 8 Pass the exterior pipe over the ventilation pipe s insulation Put on the reduction coupling 9 Adjust the roof flashing and seal firmly with asphalt sealant between the...

Страница 8: ...the tube is ideal CORRECT SETTING At the correct setting the compost has a porous and moderately moist consistency If liquid stays on top of the compost and seeps into the tray slowly then the compost...

Страница 9: ...e tray goes is clean 7 Replace the level tube and the front cover Prepare for brief absences If you are away for more than two days turn the power off otherwise the compost will become hard and dry If...

Страница 10: ...vel tube on the left side as viewed from the front the tray has overflowed Increase the setting and wait a couple of days before emptying 4 If the compost does not become drier the excess liquid will...

Страница 11: ...dry page 8 What do I do if the shear pin breaks The shear pin can easily be replaced The shearpin is not covered by warranty An extra shear pin is fixed next to the mixer motor When do I need to call...

Страница 12: ...BioLet Toilet Systems Inc 830 West State Street Newcomerstown OH 43832 info biolet com www biolet com Graphic design and production ADHT Print Typoprint Sweden 2021...

Отзывы: