
BIOSUN-340_(Anglais) - DOC012466 - Ind. B03 - 21/06/2017
Copyright BIO-UV
Marque, Modèles et Brevets déposés - Produits exclusifs
Page 27
G.
INSTRUCTIONS FOR SERVICING OF THE BIOSUN 340 TERMINAL
1.
Backwashing the filter
It is recommended that a filter backwashing operation be performed once a week as a preventive measure.
When the flow rate of BIOSUN terminal decreases, this means that the filter is clogged: A filter backwashing operation
should be carried out. During operation, the two valves should be set to the "filtered" position.
To backwash, lower the handle to the "Cleaning" position for a few seconds until water comes out clear. During this
operation, the water exits through the drain hole at the rear of the terminal.
2.
Tank draining
When suspended solids have settled at the bottom of the tank, they must be removed using the draining valve
The tank draining valve should always remain closed when the terminal is in normal operation
Cleaning position : for filter
backwashing
Filtration position : for water
treatement (Normal
operation)
Tank draining valve
Here, in draining position
Drain d32mm located on the rear of the BIOSUN frame
Possibility to connect a d20mm draining pipe
Содержание BIOSUN 340
Страница 1: ...BIOSUN 340_ Anglais DOC012466 Ind B03 21 06 2017 BIOSUN 340W INSTALLATION AND MAINTENANCE MANUAL...
Страница 40: ......
Страница 42: ......