background image

6.  Continue building the wall.

7.  First stud on either side of the firebox must be flush    

 

with the firebox and flange.

8.  Install a stud horizontally on top of the firebox to be    

 

able to continue with the wall.

www.biofireplacegroup.com

Отзывы: