background image

4

5

6

1

2

3

Now that the large fence panel (

21524

) is fixed in place you can now fix the medium fence

panel (

21523

) in place on the front of the base. The medium fence panel should sit flush

with the end of the large fence panel. Once it is in position drill the pilot holes and fix in

place With 

S50

 screws.

4

21524

21523

S50

S50

S50

S50

21523

21524

level

at front

Front

Front

32

Picket Fence On Base

S50

S50

S50

S50

S50

Side

21524

31

Fit tightly against the

front of the building

Picket Fence On Base

30

N30

N30

N30

N30

N30

N30

N30

Ensure there

is a 24mm gap

WARNING!

This dimension is required

as part of safety to avoid

entrapment of feet.

Now that your building has been assembled you are ready to add the decking to the base.

The first length of decking (

SQ-01

) is positioned tightly up against the building front floor

joist. It is then fixed in place with two 

N30

 nails where the decking crosses the base joists.

29

N30

N30

N30

N30

N30 N30

N30

Fit tightly

against the

front floor joist

24mm 24mm

S50

S50

S50

S50

S50

Side

33

Fit tightly against the front of the building

Picket Fence No Base

Option B

Medium Picket Fence 856

(21523 - QTY x 4) 

Option D

Large Picket Fence 1172

(21524 - QTY x 2) 

21524

or

21523

34

21523

21524

level

at side

Front

21523

21524

or

21523

S50

S50

S50

S50

Front

Picket Fence No Base

Place the second length of decking next to the first, ensuring there is a distance of 

24mm

between them. It is extremely important that this gap is the exact distance for safety

reasons.

Fix each length of decking with  two 

N30

 nails where it crosses the base joist.  

If you have purchased a Picket Fence to go with your base, place the largest fence panel

(

21524

) and position tightly against the front of the builing. The fence needs to be sitting

on the edge of the base. Once it is in place, pilot drill the holes and fix to the building and

base with 

S50

 screws. 

Now that the side fence panel (

21524 or 21523

) is fixed in place you can now fix the front

fence panel (

21523

) in place at the front. The front fence panel should sit flush with

the side fence panel (see diagram). This is done to allow the door to open fully. 

Once it is in position drill the pilot holes and fix in place with 

S50

 screws.

If you do not have a base with your building, the picket fence will sit on the ground.

Take the side fence panel (

21524 or 21523

) and position tightly against the front of the

builing. Drill the pilot holes and fix in place with two 

S50

 screws.

S50

21524

Side

Base

Fence sits

on base 

For Queries and Help please access our Support Centre: www.gardenbuildingsdirect.co.uk/help

Содержание INS-0072

Страница 1: ...ions Please read the instructions carefully and please retain for future reference Please note that all images are for illustration purposes only For Queries and Help please contact Product Support 01...

Страница 2: ...thinking of modifying this building be aware that any modifications invalidate your warranty and may affect your consumer rights We do not recomend fitting optional building parts such as a base from...

Страница 3: ...with the fixing kit for safer transportation If they are still not found please visit our Support Centre www gardenbuildingsdirect co uk help Q What tools do I require A Drill with 4 5 3 and 2mm drill...

Страница 4: ...TY x 2 FSS Floor SS or T G 1052 5mm x 1465mm EP Eaves Purlin R4C 28x28 0879 SQ QTY x 4 CP Centre Purlin R4C 28x28 1465 SQ QTY x 1 FI Final 14471 QTY x 2 FB Fascia Board 14468 QTY x 4 25877 QTY x 2 WP...

Страница 5: ...ase 9ft Deep L2561 7 15734 Eze Base 7ft Gable L2105 2 15737 38mmx38mm Pressure Treated Spike 4 PT 01 11mm x 68mm Square Boards 13 SQ 01 PT 01 38mmx38mm Pressure Treated Spike QTY x 4 SQ 01 11mm x 68mm...

Страница 6: ...ere to nd everything HANDY TIP Sort xings and wood kit by size and piece before starting Use a suitable drill bit for pilot hole 3mm is recommended for most 3mm or 4mm Avoid splitting wood by pre dril...

Страница 7: ...ground on its shorter side Take one of the longer Side Joists 15734 This will be 2561mm and position it at a 90 degree angle to the first joist 15737 ensuring it fits against the side Drill a pilot h...

Страница 8: ...r with 50mm screws S50 Repeat this process for the front Plain Gable Apex PG Tip Pre drillallholesbeforefixing PGL PGL PG PGR PGR S50 S50 S50 PP On the ground fix the rear Gable Apex PGL PGR to the Pl...

Страница 9: ...ixed to the front of the Roof Panels RSS Tip Useoneofthepurlinstodrawalinealongtheboardtohelplocatewherethepurlinwillbe whenfixingtheminplace N30 N30 EP RSS The opposing front roof panels should look...

Страница 10: ...sides and gables of the playhouse Make sure a nail penetrates the Centre Purlin CP at each end of the Roof Panel RSS Tip Usethisstagetosquareyourbuilding Door Gable N30 N30 N30 N30 Top View S50 S50 S...

Страница 11: ...to outside of the door Metal Catch is fixed to the inside of the door S10 MC S25 MC 26 27 S30 DSB DSB DG DG Fix a Door Safety Block DSB to the Door Gable DG from the inside of the bulding using 30mm...

Страница 12: ...Y x 2 21524 or 21523 34 21523 21524 level at side Front 21523 21524 or 21523 S50 S50 S50 S50 Front Picket Fence No Base Place the second length of decking next to the first ensuring there is a distanc...

Страница 13: ...G WUXVV XVLQJ PP 6FUHZV 6 XW RXW WKH ODVW ERDUG WR XVK RQ HDYHV ZDOO S30 80mm Cut and lay the board L 1758mm aligned to the tip of the Gable Fix the board using 30mm Screws S30 See the image above S30...

Отзывы: