background image

7

8

9

 10

 11

 12

With the Plain Gable (

PG

) held at the rear of the Floor (

FSS

) place a Window Panel (

WP

adjacent to it and fix them together with  50mm screws (

S50

).  Screw the panels 

together through the framing on the inside of the panels.

Tip: Pre-drill all holes before fixing.

 WP

S50

S50

S50

FLOOR

PLAIN GABLE

WINDOW P

ANEL

S50

S50

S50

S50

S50

On the ground fix the three rear Plain Panels (

PP

) together with 50mm screws (

S50

).

Please note that the  centre Plain Panel (

PP

) is  narrower than the outer two panels.  

Tip: Pre-drill all holes before fixing.

  PP

  PP

  PP

S50

S50

S50

 WP

On the ground                                                          fix the front Plain Gable Apex to the two front 

Window Panels                               (

WP

) with  50mm screws (

S50

).  Please note that the lower 

corners of the Gable Apex reach out passed the Window Panels (

WP

).  The boards of the 

Gable Apex (

GA

) must be in-line with the boards of the Window Panels (

WP

) below.

Tip: Pre-drill all holes before fixing.

S50

S50

S50

 WP

 WP

 PG

S50

S50

 PGL

 PGR

Fix the rear Plain Gable Apex (made from 

PGL

 and 

PGR

) sections together with 

50mm screws (

S50

). 

Repeat this process for the front Plain Gable Apex (

PG

).  

Tip: Pre-drill all holes before fixing.

 PGL

 PGL

  PG

 PGR

 PGR

S50

S50

S50

 PP

On the ground fix the rear Gable Apex (

PGL & PGR

)  to the Plain Panel (

PP

) assembly with 

50mm screws (

S50

). Please note that the lower corners of the Gable Apex reach out passed 

the Plain Panels (

PP

).The boards of the Plain Gable Apex must be in-line with the boards of 

the Plain Panels (

PP

) below.

Tip: Pre-drill all holes before fixing.

 PP

PGR

FSS

FSS

Front

Rear

The floor panels (

FSS

) are made up of 4 Floor Joists (

FJ

) and 1 solid sheet board each.  

4 Floor Joists (

FJ

) are evenly spaced out underneath the boards and fixed in place with 

30mm nails (

N30

) at intervals of approximately 300mm. Place the floors side by side.  

Tip: Use one of the joists to draw a line along the board to help locate where the joist will be when fixing them 

in place.   NOTE: The Floors (FSS) may come fully assembled.  

IMPORTANT NOTE: To be erected correctly this building should be constructed and placed on a flat, level base. 

Please refer to the Base Building guide for information on building a level base.

   FJ

300mm

N30

N30

300mm

300mm

300mm

300mm

For Queries and Help please access our Support Centre: www.gardenbuildingsdirect.co.uk/help

Содержание INS-0072

Страница 1: ...ions Please read the instructions carefully and please retain for future reference Please note that all images are for illustration purposes only For Queries and Help please contact Product Support 01...

Страница 2: ...thinking of modifying this building be aware that any modifications invalidate your warranty and may affect your consumer rights We do not recomend fitting optional building parts such as a base from...

Страница 3: ...with the fixing kit for safer transportation If they are still not found please visit our Support Centre www gardenbuildingsdirect co uk help Q What tools do I require A Drill with 4 5 3 and 2mm drill...

Страница 4: ...TY x 2 FSS Floor SS or T G 1052 5mm x 1465mm EP Eaves Purlin R4C 28x28 0879 SQ QTY x 4 CP Centre Purlin R4C 28x28 1465 SQ QTY x 1 FI Final 14471 QTY x 2 FB Fascia Board 14468 QTY x 4 25877 QTY x 2 WP...

Страница 5: ...ase 9ft Deep L2561 7 15734 Eze Base 7ft Gable L2105 2 15737 38mmx38mm Pressure Treated Spike 4 PT 01 11mm x 68mm Square Boards 13 SQ 01 PT 01 38mmx38mm Pressure Treated Spike QTY x 4 SQ 01 11mm x 68mm...

Страница 6: ...ere to nd everything HANDY TIP Sort xings and wood kit by size and piece before starting Use a suitable drill bit for pilot hole 3mm is recommended for most 3mm or 4mm Avoid splitting wood by pre dril...

Страница 7: ...ground on its shorter side Take one of the longer Side Joists 15734 This will be 2561mm and position it at a 90 degree angle to the first joist 15737 ensuring it fits against the side Drill a pilot h...

Страница 8: ...r with 50mm screws S50 Repeat this process for the front Plain Gable Apex PG Tip Pre drillallholesbeforefixing PGL PGL PG PGR PGR S50 S50 S50 PP On the ground fix the rear Gable Apex PGL PGR to the Pl...

Страница 9: ...ixed to the front of the Roof Panels RSS Tip Useoneofthepurlinstodrawalinealongtheboardtohelplocatewherethepurlinwillbe whenfixingtheminplace N30 N30 EP RSS The opposing front roof panels should look...

Страница 10: ...sides and gables of the playhouse Make sure a nail penetrates the Centre Purlin CP at each end of the Roof Panel RSS Tip Usethisstagetosquareyourbuilding Door Gable N30 N30 N30 N30 Top View S50 S50 S...

Страница 11: ...to outside of the door Metal Catch is fixed to the inside of the door S10 MC S25 MC 26 27 S30 DSB DSB DG DG Fix a Door Safety Block DSB to the Door Gable DG from the inside of the bulding using 30mm...

Страница 12: ...Y x 2 21524 or 21523 34 21523 21524 level at side Front 21523 21524 or 21523 S50 S50 S50 S50 Front Picket Fence No Base Place the second length of decking next to the first ensuring there is a distanc...

Страница 13: ...G WUXVV XVLQJ PP 6FUHZV 6 XW RXW WKH ODVW ERDUG WR XVK RQ HDYHV ZDOO S30 80mm Cut and lay the board L 1758mm aligned to the tip of the Gable Fix the board using 30mm Screws S30 See the image above S30...

Отзывы: