B
20
Manual model IndAC
3.4.2
Annual maintenance
-
Perform all monthly checks.
-
Check the cabling between the terminal
boxes in the units and the control unit.
-
Check the casing, the hanging or fixing
construction, and the securing of each
unit.
-
Check if the fans are mounted correctly
and are not running out of true. If neces-
sary, fasten them again.
For units with electric heating:
-
Check the wiring between the control unit
and the heating section.
-
Check the feeder cables and the connec-
tions in the heating section.
-
Check the relays in the heating section.