Industrial Air Curtain
2
Installation
Version 2.1, English (27-10-2008)
17
8
Vent the heat exchanger, if necessary.
For units with electric heating:
9
Set the isolating switches on all units to
position 1.
10
Switch the air curtain on using the control
unit.
11
Feel if the discharged air gets warm.