UPSI-1208DPx
Revision 2-0
27
F6 Initial operation
The correct installation of the UPS has to be ensured.
The start is accomplished by connecting the upstream power supply:
When an input voltage higher
than 11.5 V is connected to the input terminals, the energy storage gets queried and transmits its data. The UPS
sets the corresponding end-of-charge voltage and releases the pack via the system present signal.After that,
the charging of the energy storage starts.
The applied voltage at the input of the UPS is passed through to the output, reduced by a current-dependent
voltage drop (V
OUT
= V
IN
- 0.6 V at maximum current). The device charges the energy storage and monitors the
upstream voltage thresholds at the input (UPS function).
It must be ensured that the source supplies enough current to guarantee the charging process (see chapter F4
„Dimensioning the upstream power supply“).
Even after disconnecting the upstream source and also no voltage is measurable at the output,
the UPS can be still powered by the energy storage.
CONNECTOR
PART NO.
COUNTERPART NO.
V
IN
/V
OUT
Würth Elektronik 691325310004
Würth Elektronik 691364300004
RL
Würth Elektronik 691305140002
Würth Elektronik 691304130002
USB
Würth Elektronik 61400416121
USB type B connector
RS232
D-Sub9 Female
D-Sub 9 Male
F7 Overview connector / Counterpart with description / Scope of delivery
SCOPE OF DELIVERY
QUANTITY
DESCRIPTION
1x device
UPSI-1208DP2 or UPSI-1208DP3 - DC UPS
1x
V
IN
/ V
OUT
connector counterpart
1x
Relay connector counterpart
F8 Charging time
Charging times depend on energy storage, input voltage and the load current.