- 40 -
TemperaTure probe
panel.
2 Empty the d.h.w circuit of the boiler.
3 Remove the electric connector I (Figure 15.4)
4 Remove the fork J and pull the d.h.w. Temperature probe C.
5 Reassemble the d.h.w. Temperature probe carrying out the
removal operations in reverse order.
warning: to lubricate the O-ring gaskets exclusively
use a silicone base grease compatible to be in con-
tact with foods and approved by the local water au-
thorities .
figure 15 .4
i
J
c
removal of the d .h .w . intlet temperature probe
6 Remove the front panel of the case and lower the control
panel.
7 Empty the d.h.w circuit of the boiler.
8 Remove the electric connector K (Figure 15.5)
9 Remove the fork L and pull the d.h.w. Temperature probe D.
10 Reassemble the d.h.w. Temperature probe carrying out the
removal operations in reverse order.
warning: to lubricate the O-ring gaskets exclusively
use a silicone base grease compatible to be in con-
tact with foods and approved by the local water au-
thorities .
figure 15 .5
K
l
d