- 54 -
INST
ALLA
TION
COMMISSIONING
7
COMMISSIONING
7.1 Warnings
The commissioning of this boiler and sys-
tem must only be undertaken by a Gas
Safe Registered Engineer in accordance
with the requirements of the Gas Safe In-
stallation and Use Regulations and be ap-
proved by Gas Safe.
Ensure that the Benchmark Checklist is
satisfactorily completed during the com-
missioning process. The Checklist is
located at the end of this manual. This
manual should be handed to the user fol-
lowing completion of the installation and
commissioning process. Failure to comply
with these requirements may invalidate the
manufacturers guarantee.
For Ireland (IE), it is necessary to complete
a “Declaration of Conformity” to indicate
compliance to I.S.813.2002.
7.2 Electrical installation
Preliminary electrical system checks to en
-
sure electrical safety shall be carried out by a
competent person. i.e. polarity, earth continu
-
ity, resistance to earth and short circuit.
If a fault has occurred on the appliance the
fault finding procedure should be followed as
specified in the service manual.
7.3 Gas supply installation
•
Inspect the entire installation including the
gas meter, test for tightness and purge, all
as described in BS 6891;
For Ireland (IE), refer to I.S.813.2002.
•
Open the gas cock 6 (Fig. 7.1) on the appli
-
ance and check the gas connector on the
appliance for leaks.
Fig. 7.1
Open
position
6
7.4 Filling the D.H.W. system
•
Close all hot water draw-off taps.
•
Open the valves located in the lower part of
the boiler (Fig. 7.1).
•
Slowly open each draw-off tap and close it
only when clear water, free of bubbles, flows
out.
7.5
Initial filling of the system
•
Open the C.H. flow and return valves.
•
Remove the front and side panels of the
case (section "Dismantling the external pan
-
els" on page 75) and the sealed chamber
lid.
•
Loosen the cap on the automatic air purger
valve 24 in Fig. 7.2 and leave open perma
-
nently.