INST
ALLA
TION
COMMISSIONING
Fig. 7.9
A
B
30
If it does not comply with the required pres-
sure check the gas supply line and governor
for faults and/or correct adjustment.
Where the boiler is connected to a gas
supply which has a zero set governor
then it is necessary under the Gas Safety
(Installation and Use) Regulations 26.9.
to perform a combustion analysis test
for CO/CO2 (The limits for the boiler is
given in "Technical Data" section pag. 26
Activ A 25C, pag. 29 Activ A 30C and pag.
32 Activ A 35C: CO2 contents / other fl ue
gas fi gures) and complete the Certifi cate
of Exemption section of the Benchmark.
Important: after the checks all of the test
points must be sealed.
Enabling functioning of the
7.10
external temperature probe by
the remote control
Functioning with the external probe in the
boiler must be enabled if the remote control
(optional) is used.
Act on the programming of the REMOTE
control to enable its functioning if the re-
mote control (optional) is used.
Press button
•
for more than 3 seconds to
enter in
mode.
Fig. 7.10
0
2
1
8
1
21
1 5
6
3
9
Press buttons
and
at the same
time to enter the transparent programming
( Fig. 7.11 )
Fig. 7.11
Press buttons
•
or
to display
the
"PM15"
program that enables the ex-
ternal probe ( Fig. 7.12 )