background image

13

Make sure that the machine is fully disconnected and all moving 

parts are secured before performing any maintenance/repair 

work on the machine.

Immediately disconnect power off the machine in case of any 

eventual fault or trouble.

Before performing any maintenance/repair work on the machine, make 

sure that the grapples are open wide and securely set on  ground with 

the machine fully disconnected and all moving parts stopped and secured. 

DANGER  : a loader with the grapple pivotally connected to a 

universal U-joint (pivot) will stand at tilt-over risk unless it is 

firmly supported and secured against collapsing.

• Provide immediate replacement of defective hydraulic lines and  

couplings or other hydraulic components.

• Rust, dirt and crop debris must be cleaned frequently to allow the 

piston rod of both the grapple cylinder and the slewing cylinder to ope-

rate trouble-free.

• Keep the log fork and the grapples tines clean.

• Check for proper conditions of the electric system 

• Replace eventually damaged, missing or unreadable labels

• Check for trouble-free operation of the pulleys and replace bearing if 

required 

6.1   Services to be provided at 10 hour operation intervals 

• Lubricate all moving parts by means of the respective  

  nipple head

• Recommended lubricant:   universal lub grease

• Check the conditions of all hydraulic couplings and hoses

• Tightening all screwed/bolted joints, checking and replacing eventual 

missing hardware.

7.  HANDLING AND TRANSPORTATION 

A switched-off loader stands at instability risk as the grapple keeps 

hanging pivotally on the universal joint.

Always secure the loader against tipping over, folding up and/or collap-

sing.

Make sure to close the grapple and set it across travel direction 

prior to rolling without a load. DANGER: failure to comply with 

this instruction may lead to grapple damages!

6.  REPAIRS AND MAINTENANCE 

Содержание HRZ Kombi Anbau

Страница 1: ...our grapples Logging Grapples Attachment HRZ Kombi Anbau We manufacture in Germany Start up Operation Maintenance Accessories S dharzer Maschinenbau GmbH Helmestra e 94 99734 Nordhausen Harz Zentrale...

Страница 2: ...ion eld 10 4 2 Attaching the grapple arm to an implement 10 4 3 Start up 11 5 Hydraulic system 12 6 Repairs and maintenance 13 6 1 Services to be provided at 10 hour operation intervals 13 7 Handling...

Страница 3: ...sible causes listed and you are still experiencing the problem ask your Authorized Service Centre for help When you order parts maintenance or repair services your Authorized Service Centre your deale...

Страница 4: ...ally clear transport damages make sure to mark the following sen tence on the delivery bill Reserved delivery due to assumed transportation damages Insurance and shipping companies act with extreme ca...

Страница 5: ...ns in this manual before starting 5 10 Production label Product identi cation This label shows the company details of the manufacturer and the main machine technical data 6 BGU Maschinen Manufacturer...

Страница 6: ...log loader 8 Safety pictogram Danger Pinch Point Keep hands away from this danger zone till all moving parts have come to a complete stop 9 Safety pictogram Caution operating zone Stand clear do not...

Страница 7: ...e this log split ter Those who have reached school leaving age but are below the age of 16 may operate a log splitter if supervised by a competent person of 18 years or over The machine shall be insta...

Страница 8: ...d connecting the control valve unit control slide valve electric valve Always wear suitable protective gloves when doing works on the hydraulic system AVOID HAND CONTACT with hydraulic oil BEWARE a lo...

Страница 9: ...load a machine Carry a load that is safe within the ca pacity of the machine and suitably secured in the special xation points on the machine Always comply with the admissible axis loads and transport...

Страница 10: ...hing a winch to your equipment mind for user instruc tions of the winch manufacturer too Any other application i e handling loads off any higher level that the surface on which the tractor stands when...

Страница 11: ...a Do not use the grapple to handle trunks that are smaller than 8 cm in diameter unless you can bundle and lift them together Check the xation bolts and the respective cotter pins before start up Make...

Страница 12: ...aulic lines and immediately replace any defect or old tube hose Replacement hydraulic compon ents must comply with the technical speci cations of the original parts supplied by the manufacturer Check...

Страница 13: ...er and the slewing cylinder to ope rate trouble free Keep the log fork and the grapples tines clean Check for proper conditions of the electric system Replace eventually damaged missing or unreadable...

Страница 14: ...nection hoses 1200 Nm 4 5t at 230 bar Flange 140x140 4x M16x50 Part No 96255 22 kg Directional sliding valve overload safety Part no 96273 Mandatory for use of top swivelling grapples Fig 2 Hydraulic...

Страница 15: ...kW PS from 45 61 Grapples HG 1300 included Gripping capacity opening width Clamping force mm t 90 1280 9 5 Pivotal hanger for grapple rotation 160 Cardan joint xation Weight kg 522 Optional rotator W...

Страница 16: ...plicable in your country The manufacturer is not liable and undertakes no responsibility for personal injuries or damages that may result from the recycling of worn out machine parts and eventual re u...

Страница 17: ...s on their detection While asking for warranty ser vice customer should show copy of their purchase invoice or receipt The warranty does not cover for faults due to natural wear tempera ture or weathe...

Страница 18: ...3 SPARE PARTS FOR HRZ KOMBI ANBAU 1 26 23 31 30 29 22 24 26 29 30 32 10 31 30 29 27 23 24 10 10 24 22 19 18 17 19 18 16 20 21 19 18 5 10 9 8 6 7 33 2 4 3 19 13 14 12 14 15 11 Z Kombi Anbau 32 30 29 28...

Страница 19: ...5 931 1 M12x85 14 Shim 51650 125 13 15 Hex nut 51595 934 M12 16 Pivot pin 25506 17 Retaining bolt 25507 18 Spacing washer 25508 19 Shaft locking ring 51676 471 40x1 75 20 Top link pin for Cat 2 55991...

Страница 20: ...20 Grapple pivotal hanger complete assembly Zangenschwenkwerk kpl Stand Juli 2011 1 1 2 3 4 4 6 6 10 5 2x9 7 8 8 7 2x9...

Страница 21: ...Dimensions 1 Tension spring 55803 2 Shaft bushing 22379 3 Grapple connection 22383 4 Plain bearing collar less 55910 5 Hex screw 51479 933 M12x35 6 Ball lubricator 51163 AM 6x1 7 Washer 51650 125 13...

Страница 22: ...40 60 22356 4 Hydraulic cylinder 55938 80 40 510 800 290 5 Small grapple 23851 6 Large grapple 23846 7 Parallel guide 24035 8 Ball lubricator 51163 AM 6x1 9 Heavy duty pin 55936 12x60 10 Taper lubric...

Страница 23: ...rman customer s copy Venue Nordhausen Machine type Grapple loader Models HRZ Kombi Anbau Production number see Manufacturer s identi cation plate Applicable European Standards EC Directive 42 2006 Oth...

Страница 24: ...es without prior notice S dharzer Maschinenbau GmbH Helmestra e 94 99734 Nordhausen Harz Service Tel 03631 6297 104 Fax 03631 6297 111 Internet www bgu maschinen de e mail info bgu maschinen de Form 9...

Отзывы: