background image

 

Operating Instructions 

Temperature Controller Single or Double Ramp Operation (See Figure 1)

 

Single Ramp Operation: The temperature ramps in a predetermined amount of time from ambient to a set 
point temperature and holds at that temperature for a required amount of time. 

Double Ramp Operation: The temperature ramps in a predetermined amount of time from ambient to the first 
set  point  temperature  and  holds  at  that  temperature  for  a  required  amount  of  time,  it  then  ramps  in  a 
predetermined amount of time to a second set point temperature and holds at that temperature for a required 
amount of time. 

Temperature Controller Displays 

The upper display indicates the mode of the heating cycle and the process temperature. During the Ramp mode 
the upper display will toggle between the process temperature and ramping. Once the cure temperature (set 
point) has been reached the upper display will toggle between the hold time remaining (in minutes) and the 
process temperature. When the hold time becomes less than one minute the upper display will toggle between 
the  hold  time  remaining  (in  seconds)  and  the  process  temperature.  The  lower  display  indicates  the  cure 
temperature (set point). 

Cycle Start Button 

The product will heat to the set point temperature and remain there for the time selected. The hold time will 
start when the temperature reaches 15°F before set point. 

Heater Position 

If the heater is too far from the product, the temperature will not be reached and the hold timer will not be 
activated. 

 

Содержание AutoCure 5000

Страница 1: ...January 2016 AutoCure 5000 Portable Repair Arm Assembly and Operating Manual AC5 2116 380...

Страница 2: ...Pyrometer Lens 12 Trouble Shooting Guide 13 Heater Power Problems 13 Temperature Controller Problems 13 Temperature Problems 14 Temperature Controller Error Codes 15 Ramp Soak Errors 15 Service Instru...

Страница 3: ...IVE PARTS COULD CAUSE SERIOUS INJURY OR DEATH CONNECTION INSTALLATION MAINTENANCE ADJUSTMENT SERVICING AND OPERATION TO BE DONE BY QUALIFIED PERSONNEL ONLY ENSURE THAT EQUIPMENT IS COMPLETELY AND PROP...

Страница 4: ...handling heater head Do not move heater when in operation Heater contains high voltage Do not insert metallic objects into cooling louver openings Ensure that equipment is properly grounded before app...

Страница 5: ...y indicates the mode of the heating cycle and the process temperature During the Ramp mode the upper display will toggle between the process temperature and ramping Once the cure temperature set point...

Страница 6: ...ress the to exit setup menu 6 Set auxiliary heater off or on 7 Press the cycle start Double Ramp 1 Turn power on 2 Turn positioning beam on and position heater 3 Set controller parameters 4 Hold the b...

Страница 7: ...r assembly and prevent the possibility of arcing or shorting Lamp Installation Replacement Procedure 1 Make sure main system circuit breaker is OFF 2 Rotate heater so lamps are horizontal 3 Remove end...

Страница 8: ...ic terminal in heater head Ensure all bare wire is contained up to terminal trim lead if necessary Heater Power Cord Make sure lamp sleeving is pushed all the way into ceramic end of lamp Lamp Support...

Страница 9: ...re any types of reinforcements or extra thicknesses of metal in the area to be cured These areas will heat at different rates and not achieve the same temperature as the single thickness metals withou...

Страница 10: ...heat sensor aim with the positioning beam 6 Set the temperature and time settings 7 Start heat cycle 8 Approximately 3 5 minutes after start check that the temperature is at set point and the timer h...

Страница 11: ...the next repair Positioning Set Up of an arm on rocker panels heavy reinforcements multiple metal thickness 1 Follow any of the instructions previously mentioned in the precautions and instructions se...

Страница 12: ...monthly 2 Dual head units have seven 7 castle nut spring combinations and two 2 shoulder bolts with Nylock nuts If pivot points become loose heater positioning will not be maintained Check these poin...

Страница 13: ...ontactors change the temperature controller Check that the set point bottom display is higher than the process temperature top display Are the line fuses FU 101 104 in front of the contactors good che...

Страница 14: ...rcuit board or SCR by exchanging the firing circuit board with one from a known good control Does the problem follow the firing circuit board or does it stay with the SCR replace the defective compone...

Страница 15: ...y is functioning and there is no voltage at the heat sink assembly open the Raytek pyrometer and test for the voltage the 2 wire nuts replace the Positioning Beam Temperature Controller Error Codes Di...

Страница 16: ...ctions 7 Loosen and remove standoffs 8 Remove Insulating plate 9 Remove heat sink then remove Pyrometer 10 Install new pyrometer into heat sink making sure to adjust fit using varnish tape wrapped on...

Страница 17: ...ocouple side Loosen and remove nut and all washers on AC arm side 5 Unmount housing and replace with new housing 6 Install nut grommet and 2 washers onto Thermocouple leads as shown below 7 Once insta...

Страница 18: ...18 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 19: ...19 Mechanical Drawings and Parts Lists Pyrometer...

Страница 20: ...20 CAUTION...

Страница 21: ...AC 61228 INSULATOR PYROMETER 11 1 AC 61227 MOUNT INSULATOR PYROMETER 12 1 AC 611232 HOUSING PYROMETER 13 1 AC 61230 COVER PYROMETER 14 2 AC 200099 3 SCREW MACH FL HD SLOT 8 32 X 2 750 15 2 AC 200032 S...

Страница 22: ...22...

Страница 23: ...tion 4 2 X 2 TR SSEM 283 SHRINK TUBING 19 2 AC 200031 FEMALE CONNECTOR 20 2 AC 200030 MALE WIRE CONNECTOR 21 2 AC 200033 CABLE SLEEVE 22 28 AC 200052 1 MESH 23 35 AC 200077 BROWN WIRE 24 35 AC 200078...

Страница 24: ...24...

Страница 25: ...2 CUT 1 8 X 1 8 V NOTCH TO SRINK TUBE 23 INSTALL GROMMET ONTO SHRINK TUBE USING BULLET TOOL OR PLIERS 24 INSTALL 2 WASHER AS SHOWN 25 INSTALL NUT ASSEMBLY Parts Listing Pyrometer Item No QTY Part No D...

Страница 26: ...26 Heater Head Assembly ACH5 2116...

Страница 27: ...19 2 AC 50869 WASHER 1 5 OD X 531 X 125 THK 22 1 AC 63940 J BOX HEATER 24 2 AC 64237 MOD HEX BOLT 1 2 13 X 2 00 25 2 AC 54585 PIN COTTER 1 8 X 750 26 2 AC 54583 SPRING COMPRESSION 27 2 AC 39487 NUT HE...

Страница 28: ...0097 RIVET BLACK ALUMINUM 43 10 1 AC 59449 REFLECTOR OUTER 2 LAMP 1600 11 3 AC 58833 TERMINAL 3 POLE CERAMIC 600V 12 4 AC 50686 3 SCREW CAP SOCKET HD 8 32 X 1 13 5 AC 3903 1 NUT HEX FLG SERRATED NONLO...

Страница 29: ...RCEMENT HANDLE 7 2 AC 4012 3 8 16 AVK 1ST GRIP 8 2 AC 61923 INSULATOR END COVER 2 LAMP 3 CTR 9 4 AC 200097 RIVET BLACK ALUMINUM 43 10 1 AC 59449 REFLECTOR OUTER 2 LAMP 1600 11 3 AC 58833 TERMINAL 3 PO...

Страница 30: ...30 AC5 Stand 92 93 93 92 92 41 48 57 8 96 63 70 8 71 77 59 2 52 30 30 80 79 2 36 58 25 15 9 76 18 72 10 49 42 51 6 73 32 5 31 87 81 4 9 60...

Страница 31: ...ATE CASTER MOUNTING 49 1 TABLE AAA COLUMN AA POST MOUNT CONTROLS 51 1 TABLE C COLUMN CA ARM UPPER EXTENDED 52 1 AC 65844 PLATE TAPPING GAS SPRING 57 TABLE B COLUMN BD AC 3903 3 NUT HEX SERRATED 5 16 1...

Страница 32: ...SO CORD CONTROL CABLE MUST BE TO THE OUTSIDE OF THE SO CORD SPACER NOT BETWEEN THEM 43 34 50 20 21 58 65 90 37 62 62 48 62 66 75 74 59 25 N N SECTION N N SCALE 1 8 59 25 1 67 2 22 89 7 P DETAIL P SCAL...

Страница 33: ...S 43 1 AC 61220 COVER ACCESS CONTROLS 46 1 TABLE C COLUMN CC BRACKET 48 1 AC 61241 WELD BASE 50 1 TABLE C COLUMN CB ARM LOWER EXTENDED 52 1 AC 65844 PLATE TAPPING GAS SPRING 54 2 AC 68268 TUBE SPACER...

Страница 34: ...TANT READ AND UNDERSTAND OPERATORS MANUAL BEFORE INSTALLING OR OPERATING THIS EQUIPMENT XXX VOLTS AUX HEATER OFF ON SEE DETAIL F J J 3 43 50 91 35 44 53 84 85 4 9 49 33 55 53 66 38 62 47 45 62 39 62 4...

Страница 35: ...RATION LABEL 38 4 AC 52841 SPACER ARM TUBE 39 1 AC 57416 HOOK CABLE 43 1 AC 61220 COVER ACCESS CONTROLS 44 1 AC 61221 1 BRACKET GAS SPRING 45 1 AC 61221 2 BRACKET GAS SPRING 47 1 TABLE C COLUMN CD BRA...

Страница 36: ...36 F DETAIL F POSITION LEVER CAUTION REF ABOVE ITEM CENTERED AC 59981 68 62 44 47 38 62 51 49 42 19...

Страница 37: ...AC 52841 SPACER ARM TUBE 42 1 AC 61219 BAFFLE ELECTRICAL CORD 44 1 AC 61221 1 BRACKET GAS SPRING 47 1 TABLE C COLUMN CD BRACKET POST 49 1 TABLE AAA COLUMN AA POST MOUNT CONTROLS 51 1 TABLE C COLUMN C...

Страница 38: ...38 BG K FINISHING SYSTEM S DANGER CAUTION CAUTION DANGER LETHAL SHOCK 78 L L SECTION L L SCALE 1 8 M DETAIL M SCALE 1 4 49 33 82 56 88 19 19 19 19 CAUTION 27 23 29...

Страница 39: ...5 1 4 X 5 8 FLAT HEAD 27 12 AC 3775 WASHER FLAT 1 2 ID SST 29 1 AC 49155 NUT METRIC GAS SHOCK 33 1 AC 59981 KIT ACTUATOR RELEASE 49 1 AC 59981 KIT ACTUATOR RELEASE 56 13 AC 4090 WASHER FLAT 10 SST 78...

Страница 40: ...40 SECTION J J SCALE 1 8 K DETAIL K SCALE 1 4 88 53 89 64 63 83 86 16 17...

Страница 41: ...ULDER SCREW 9 2 AC 3772 1 4 FLAT WASHER 10 2 78405 06 WASHER FLAT USS 312Z 11 7 AC 3773 3 8 FLAT WASHER 12 4 AC 3903 NUT HEX SERRATED 1 4 20 14 4 AC 3831 3 8 HEX NYLOCK NUT 15 10 AC 3887 10 LOCK WASHE...

Страница 42: ...AC 4090 WASHER FLAT 10 SST 57 TABLE B COLUMN BD AC 3903 3 NUT HEX SERRATED 5 16 18 58 TABLE B COLUMN BD AC 200161 CLIP SAFETY TO GAS SPRING 59 6 AC 200091 2 SCREW TRUSS HD 8 32X3 4 SST 65 6 AC 200098...

Страница 43: ...20827 00 PANDUIT TYWRAP MOUNT 95 4 27141 044 TYWRAP A A SECTION A A B DETAIL B SO CORD TERMINATION DETAIL TYP 3 HEATER HEADS ATTACH 8 RING TERMINAL TO GROUND WIRE AND USE THIS SCREW TO MOUNT TO LAMP...

Страница 44: ...44 Parts List DESCRIPTION PART NUMBER QTY ITEM ASSY AC5 CRS CRL CTE STE 101861 1 1 ASSY HEATER 2306 103622 1 2 OPTICAL PYROMETER AND SIGHTING DEVICE...

Страница 45: ...45 ACH5 2116 Lamp Wiring Schematic...

Страница 46: ...ll replacement materials THIS WARRANTY IS EXCLUSIVE AND IN LIEU OF ALL OTHER WARRANTIES INCLUDING BUT NOT LIMITED TO ALL WARRANTIES OR MERCHANTGABILITY AND FITNESS FOR PURPOSE This warranty shall not...

Отзывы: