OPERATION THERMOSTAT CONTROL
1.
Verify that wheel brakes are in locked position (front two casters).
2.
Inspect humidity pan for proper water level (1/2 to 3/4 full) for proofing.
3.
Make sure the polycarbonate water pan cover is properly in place with the holes over the pan.
Refer to picture of Solid State control panel below for the following steps.
4.
Set the temperature control to the desired cabinet temperature. 90°F to 110°F is recommended as
a starting position for proofing. Increase or decrease the cabinet temperature as needed to best
suit your application.
5.
Set the humidity control to the #3 or #4 position. This can be increased if necessary to suit your
specific application.
6.
Make certain that a standard 18" x 26" sheet pan (not provided) has been inserted as a drip pan in
the slides on the bottom "outside" of the cabinet.
7.
Verify that the door(s) is closed and latched.
8.
Push the power switch to the "ON" Position. Always use this switch to turn the unit "ON” or "OFF".
9.
Allow approximately 45-60 minutes for the cabinet to achieve the necessary temperature and
humidity that you desire.
10.
The cabinet is now ready for product placement, for proofing or holding.
SOLID STATE CONTROL PANEL
Humidity
Control
Heater Indicator
Light
Power
Indicator Light
Temperature
Control
Power
Temperature
Guage
Содержание PHC70-32-A
Страница 10: ...120v Solid State Control Amp rating 16 7 amps...
Страница 11: ...120v Digital Control Amp rating 16 7 amps...
Страница 12: ...208 230v Solid State Control Amp rating 9 7 8 7 amps...
Страница 13: ...208 230v Digital Control Amp rating 9 7 8 7 amps...
Страница 15: ...Notes...