STEP 1
Remove system from packaging.
STEP 2
Select the installation location. Allow a minimum 3
inches (7.62 cm) of space below the suspended cartridge
for changeouts.
STEP 3
Select fasteners (two wood screws included) and tools
appropriate for the installation location (wood beam,
concrete, etc.).
CAUTION
To reduce the risk associated with property damage due
to water leakage:
•
Mount system in such a position as to prevent it
from being struck by other items used in the area of
installation.
• Ensure that the location and fasteners will support
the weight of the system when installed and full of
water.
STEP 4
Draw a line using a level on the mounting surface.
STEP 5
Mark the locations for the fasteners either by measuring
the distance between the bracket holes or using the
bracket itself.
STEP 6
Drill holes for the fasteners.
STEP 7
Allow 1/4” - 3/8” (6-10 mm) of each fastener to protrude
from the surface.
3 in. (7.62 cm)
minimum
2
1