3
CHECKS AND MAINTENANCE
135
GB
REMOVING THE PLASTICS FOR
MOTARD M4
To facilitate checks and operations in cer-
tain areas of the vehicle, it is essential to
remove the bodywork sections as de-
scribed below.
Removing the saddle
•
Unloosen the clamping screw
A
and then
remove the saddle by pushing it towards
the rear of the vehicle so as to disengage
it from the hook on the fuel tank.
Disassembling rear handles
•
Unscrew the two clamping screws
B
then
remove the other clamping screw
C
, po-
sitioned under the rear mudguard and thus
remove the handles
D
, taking care not to
mislay the rubber shims.
B
A
C
D
Disassembling front sides
•
Remove the front side panels, beginning
with panel
E
on the left side.
Remove the three screws
F
and screw
G
at the front, then detach the panel from the
tank. Use the same procedure for side
panel
H
, taking care to also remove screw
I
on the tank.
Then remove side panel
H
, releasing it from
the pegs on the fuel tank.
Removing the fuel tank
•
Remove screw
L
fixing the fuel tank to the
frame, detach the fuel cock line and then
remove the tank by pulling it towards the
rear of the vehicle.
Note:
The tank can be completely removed along
with the front sides, removing though, the
two lower screws
F
.
F
G
E
I
H
L
Содержание ALP 4.0
Страница 27: ...1 GENERAL INFORMATION 106 GB WIRING DIAGRAM ...
Страница 31: ......
Страница 77: ......
Страница 78: ...6 TROUBLESHOOTING 157 GB CONTENTS CHARTER 6 TROUBLESHOOTING INDEX ...
Страница 81: ...160 ...