5
WALL ANCHORING INSTRUCTIONS
INSTALLATION RECOMMENDATIONS — METAL STUDS
2 in (50 mm)
3/16 in
(5 mm)
87
Line up plywood part #87 on the wall and mark the middle of the studs on the plywood, then pre-drill
part #87 with 2 pilot holes of 3/16 in (5 mm) diameter per stud, 2 in (50 mm) apart vertically (6 holes in total).
With the bed in position, mark the positioning of the 6 holes on the drywall.
87
87
2 in (50 mm)
3/16 in (5 mm)
1
Determine the position of the bed in the room.
3
Locate and mark the positioning
of 3 studs using a stud finder.
2
Move the bed if necessary, then remove
the floor trim completely.
4
Put the bed back in its place. Level by adjusting
the legs PA-844 previously installed. If you install
the bed on a carpet, you must raise the bed by
an extra 3/8 in (10 mm).
PA-844
85183-2 AN
30
SERVICE: 1-888 8BESTAR (1-888 823-7827)
Содержание 85183-2
Страница 18: ...Assembly Murphy bed 8 85183 2 AN 18 SERVICE 1 888 8BESTAR 1 888 823 7827 TWO people are required for this step...
Страница 54: ......
Страница 55: ......
Страница 56: ......