BEST 510
INSTALLATION
(cont.)
8 — Connect your optional Auxiliary Battery
Packs.
BEST Auxiliary Battery Packs (Models 051-01BAT and 051-02BAT) are
designed to provide extra battery runtime to your 1650VA or 2000VA
BEST 510 UPS. They require no tools for installation.
Refer to BEST POWER’s
Auxiliary Battery Pack Operation and
Installation Manual
(Part Number 272-38116-0400-00) for Auxiliary
Battery Pack Installation instructions.
9
Installation
9 — If you are not using a UPS Monitoring
Software product, your UPS installation is
complete. If you are using a CheckUPS
Monitoring Software product supplied with this
UPS, plug your DB-9 connector into the DB-9 port
on the rear panel of the UPS (see Fig. 2, 3 or 4,
depending on your UPS model). Connect the
remaining end of the DB-9 cable to your
equipment, if it is not already connected to same.
Complete the monitoring product installation per
the instructions that came with the software.
The unit has a single DB-9 connector in the rear of the unit. UPS
control and monitoring signals can be sent to your host computer via this
connection. BEST Checkups is included n the UPS packaging and a suitable
DB9 cable is supplied.