Tool List

Hammer & Phillips Screwdriver
Framing Square & Level
Circular Saw and/or Hand Saw

Power Drill/Screwdriver
Measuring Tape & Chalkline
2-8' Step Ladders

Always wear safety glasses when cutting or nailing!

Thank you for purchasing our Greenbriar kit. These instructions will construct a 12'x16'
building. If you received two books, use the one with the latest revision date.

The material that is included in our kit is listed on the back page. The optional floor package,

if ordered, will be supplied by a local lumber supplier.

The door opening is for a 8' wide x 7' high garage door. You will need to order your garage
door with an 9" low headroom kit.

Our framing lumber is imported to provide you the highest quality available. However, if
you need to replace any lumber for any reason please do so and we will reimburse you.

The foundation size should measure 12'-0" wide by 16'-0". Do Not make the foundation
larger  than the building size. The siding should project beyond the foundation for water to

expel properly from the sidewalls.

IMPORTANT: Unpack the material from the pallet, then disassemble the pallet. The bit for
the screws is packed in the hardware bag. Remove the OSB panel from the pallet, it will be
used for roof sheathing. The 2x4s will be used for wall bracing.

When building the trusses, our instructions suggest using the floor as a work area. If your

foundation is a concrete slab it will not be possible to use this method. Build the 12' long

back wall to use as a platform. If you do not want to screw blocks into the siding you can

temporality tack OSB sheathing to the back wall frame.

The LP siding has a 50 year warranty and is already primed. Apply two coats of latex acrylic
paint for the finish coat. Paint the bottom edge of the siding, this is very important. Maintain

6" to 8" of clearance from the bottom edge of the siding and the ground. Don't allow garden
mulch to build up and keep shrubs a minimum of 1' away from the building.

If you have any questions about assembling the kit, call 800-245-1577. If you are calling
after normal business hours, call 724-866-HELP (4357) or email to [email protected].

Before you begin construction, be sure to study this assembly manual. Also, obtain a building
permit and check all pertinent building code regulations.

Thank you for your purchase.

Bill & Linda Rinella, owners

I

MPORTANT

 I

NFORMATION

 A

BOUT

 Y

OUR

 S

HED

 K

IT

Содержание the Greenbriar

Страница 1: ...enville PA 16125 724 646 3775 This manual is copyrighted Under the copyright laws this manual may not be copied in whole or in part without consent from Reynolds Building Systems Inc Copyright 2012 th...

Страница 2: ...sassemble the pallet The bit for the screws is packed in the hardware bag Remove the OSB panel from the pallet it will be used for roof sheathing The 2x4s will be used for wall bracing When building t...

Страница 3: ...for 12 on center joist spacing X marks where floor joist will be placed Shown below is a typical wood floor Depending on your area the construction may have to be changed to meet local codes The foun...

Страница 4: ...he floor be level and square Square the floor as follows before nailing the flooring measure the floor diagonally corner to corner Then measure the opposite corners These measurements will be the same...

Страница 5: ...nstall a 2x4 90 collar tie between the 2x4 boards Hold in place with 2x4 blocks Install 12 x24 gussets to the ends of the collar tie Glue and nail using 14 nails per gusset 5 Turn this truss over and...

Страница 6: ...ate 2 Place 2 two truss members in the jig Secure the top together with a barbed metal plate 3 Remove the 2x4 blocks at the corners of the floor and insert the gable plate assembled above into the bir...

Страница 7: ...2x4 gable Overhang 2 Cut a siding panel 39 in length This will be used for the center of the gable Cut the remaining siding panel in half for the ends of the gable 3 Install the siding extending 1 4...

Страница 8: ...together with the letters A and B 68 1 2 Wall Plate 24 19 3 4 24 23 1 4 68 1 2 Wall Plate A B 4 Square wall frame Measure diagonally corner to corner The measurements will be the same when the wall i...

Страница 9: ...1 Position 2x4 72 boards together and indicate with X marks where the wall studs will be located 72 Wall Plate 24 23 1 4 24 23 1 4 72 Wall Plate 72 Bottom Plate 2 Install 7 wall studs between the top...

Страница 10: ...nter of the wall frame 2 Repeat to assemble another 4 wall section 4 Repeat to apply siding to the other 4 wall frame 2x4 4 Bottom Plate 4 Wall Panel Step 6 Assemble 4 Long Sidewalls 3 Square wall fra...

Страница 11: ...wall frame using a 7 wall stud the double stud and 2 two 19 long 2x4 wall plates Use 10d sinkers Edge Extends3 1 2 Beyond Frame 5 Install the remaining siding panel flush with the edge of the 2x4 head...

Страница 12: ...header built above between the front wall panels 2x4 7 Wall Brace 12 Sidewall Door Header 4 Sidewall 1 Cut 2 two 2x4 10 boards to a length of 99 2 Install 2 two 3 x 48 long OSB fillers from our kit o...

Страница 13: ...r Jamb 1 Install 48 long x 5 3 8 wide primed siding material on the top of the door opening 2 Install 83 long x 5 3 8 wide primed siding material on the sides of the door opening 3 8 Thick Primed Door...

Страница 14: ...ough the gable plate with 10d sinkers Step 10 Install Gables Sidewall Step 11 Install 2x4 Tie Plates 2x4 6 Tie Plates Install 2x4 6 boards as tie plates on the both sidewalls between the rear and fron...

Страница 15: ...f the first truss Important When marking the opposite wall place the X mark on the same side of the line so your trusses are parallel when they are installed 2 Using 1 1 2 hanger nails install metal h...

Страница 16: ...oof Trusses Rear Gable Set roof trusses Secure trusses to metal hangers with 1 1 2 hanger nails Step 14 Install Eave Soffit Install 5 wide siding panels as soffit under the truss overhang Use 8d galv...

Страница 17: ...rt The top row of roof sheathing will be about 1 below the ridge to allow for ventilation if ridge vent is used Important Make sure the front gable is plumb and the roof sheathing extends 8 1 2 past t...

Страница 18: ...16 Install Front Soffit Soffit Panels 1 Install 86 long 2x4s under the front edge of the roof sheathing Hold the 2x4s against the roof sheathing and screw through the sheathing into the 2x4 boards Us...

Страница 19: ...of the door opening to support the door track 2 Install 51 1 2 long 2x4s across the top of the door jamb If you ordered the optional floor install the galvanized door sill Secure sill with pan head s...

Страница 20: ...ing Center the nail in the nailing slots DO NOT nail the siding tight The panels should float on the nails to provide for expansion and contraction Nail into wall studs wherever possible If it is nece...

Страница 21: ...ntents Optional ridge vent provides ideal ventilation Step 19 Install Roofing Not Supplied in Kit 1 Install metal roof edging perimeter of the roof area If you are not installing shingles at this time...

Страница 22: ...wood Gusset 3 4 3 5 x 32 2 Roof Sheathing 7 16 37 1 2 x 81 1 2 3 1 lb box 10d Sinkers 3 1 lb box 8d Galv 2 1 lb box 7d Sinkers 1 1 lb box 6d Galv 3 1 lb box 6d Common 1 1 lb box 1 1 2 Hanger Nails 6 e...

Страница 23: ......

Отзывы: