There are (2) two 2x4s that are screwed to each pallet. Unscrew these 2x4s and use (2) two
of the 2x4s as braces to hold the walls straight. The other 2x4s will be used later.
Step 11
Set Walls
Layout both beams for the spacing of the loft floor joists.
The 'X' marks where the floor joist will be placed.
Step 12
Layout Loft Joist Spacing on 2x6 Beam
2x4 Bottom Plates
1.
Set the back wall panel between the side walls. Secure wall panels together at the corners
using (4) four 10d coated sinker nails per corner.
2.
Install the front wall frame between the side walls.
3.
Install the last siding panel on the side walls. Nail along the siding edge where the side wall
siding panels overlap.
Nail Along
Siding Edge
Front Wall Frame
2x4 Wall
Brace
23-1/4"
24"
24"
4.
Unscrew and remove the 2x4 door spacer (this will be used later). Cut and remove the
bottom 2x4 in the door opening. Secure walls to floor using 10d sinkers or concrete
anchor bolts (not supplied).