When measurements are given for a board

length or width, it is from the longest side.

measure from here

I

MPORTANT

 I

NFORMATION

 A

BOUT

 Y

OUR

 S

HED

 K

IT

Tool List

Hammer & Hand Saw

Framing Square & Level

Power Circular Saw

Power Drill/screwdriver

Measuring Tape

2 - 8' Step Ladders

Always wear safety glasses when cutting or nailing!

Thank you for purchasing our shed kit.  Read the instructions before starting the assembly of
the building.  If you have any questions about assembling the kit, call 800-245-1577. Business
hours (8:00-5:00 ET) Monday thru Friday.  After business hours call 724-866-HELP (4357).

The foundation size should measure 12'-0" wide by 12' long. Do Not make the foundation
larger  than the building size. The siding should project beyond the foundation for water to

expel properly from the side walls.

The material that is included in our kit is listed on the back page.  The optional floor package,

if purchased, will be supplied by a local lumber supplier.  Our kit does not include the shingles,

the quantity needed is listed on the back page.  The siding is primed.  You will need to apply
a finish coat using latex acrylic paint.

Most buildings are installed on a wood floor and the siding was designed to extend over the
wood flooring.  If the foundation is a concrete floor cut the siding flush with the bottom of

the wall plate to prevent the concrete from contacting the siding.

The (2) two center boards on the shipping  pallet can be removed and used for wall bracing.

Stacking the boards, according to size, will make them easier to find when needed.  Do Not

discard any material until your building is complete.

Before you begin construction, be sure to study this assembly manual. Also, obtain a building
permit and check all pertinent building code regulations.

Содержание Fairview-R

Страница 1: ...ted Under the copyright laws this manual may not be copied in whole or in part without consent from Reynolds Building Systems Inc Copyright 2018 Fairview R Building Size 12 x12 205 Arlington Drive Gre...

Страница 2: ...y from the side walls The material that is included in our kit is listed on the back page The optional floor package if purchased will be supplied by a local lumber supplier Our kit does not include t...

Страница 3: ...oor joist to 11 9 Treated lumber may be thicker than 1 1 2 Take this into account when cutting the length of floor joists Shorten joist measurements if necessary to obtain 12 0 building width 1 Cut 2...

Страница 4: ...Install the first siding panel with the LAP edge flush the end of the wall and extending 3 4 below the bottom plate Use 8d galv nails spaced 8 apart 5 Install 2 two more siding panels Siding Extends...

Страница 5: ...tend 3 4 below the bottom plate Nail both siding panels to frame 1 Locate 2 two 34 3 4 long 2x4s and position them together Indicate with X marks where studs will be located 2 Install 3 three 72 wall...

Страница 6: ...elow the bottom plate 5 Install 2 two more siding panels Cut the last panel to extend 3 1 2 beyond the wall frame X X X X X X 68 1 2 Wall Plate 2x4 72 Wall Studs Step 3 Assemble 12 Long Sidewalls No D...

Страница 7: ...ndow box Step 4 Assemble 2 Two Front Wall Frames 1 Cut 2 two 58 1 2 long 2x4s to 56 1 4 Position them together and indicate with X marks where studs will be located 56 1 4 Wall Plate 56 1 4 Wall Plate...

Страница 8: ...eader Support Step 6 Apply Siding to Right Front Wall Frame OSB Filler 1 Gather 2 two 31 1 2 long 2x4 boards and 3 1 4 x 31 1 4 OSB filler panel Nail header together from both sides with 10d sinkers s...

Страница 9: ...blocks to the floor using 2 1 2 screws This will ensure that the gable frames and the trusses assembled next are identical 4 Secure the top of the truss rafters together with a 1 x4 barbed metal driv...

Страница 10: ...rs at the top with a 8 x 20 wood gusset Apply wood glue between the 2x4s and the gusset Nail the gusset to the 2x4s with 14 fourteen 6d common nails 3 Install 2 two 12 x24 gussets at ends of the colla...

Страница 11: ...sidewall panels Nail through the wall stud into the ends of the header Toenail into the top wall plates 4 Install the 31 1 2 door header between the front wall panels 5 Remove the center 2 two 2x4 84...

Страница 12: ...Door Trim 1 Install 2 two 75 3 4 long 1x3 corner trim boards to the side wall flush with the top 2x4 wall plate and flush with siding on the front and back walls Use 8d galv nails spaced 12 apart 2 R...

Страница 13: ...5 Repeat to install filler on the opposite wall 1x4 Trim Step 13 Install Front and Back Wall Trim 1 Install 2 two 75 3 4 long 1x4 trim boards on the front wall flush with top of 2x4 wall plate and flu...

Страница 14: ...le over so bottom plate is on edge on floor Support gable studs and rafters with 2 two 2x4 72 boards stacked This will give you a solid surface when nailing siding 2 Install left gable siding panel wi...

Страница 15: ...2 Install metal hangers to the tie plate with 6d common nails The opening should line up with the X mark the bottom of the opening flush with the 2x4 tie plate Detail D 24 20 5 8 Measure from Backsid...

Страница 16: ...sh with the gable siding Use 6d galv nails Siding Filler 2x4 Blocks 1 Set roof trusses Secure trusses to metal hangers with 6d common nails 2 Install short 2x4 blocks at both ends of each truss Secure...

Страница 17: ...Edge 2x4 Tie Plate 2x4 Soffit Block 1 Starting at the rear of the building install a 1x4 6 white pine fascia board against the rear gable trim Install the fascia so the bottom edge of the roof sheathi...

Страница 18: ...sinkers spaced 12 apart The top row of roof sheathing will be about 1 below the ridge to allow for optional ventilation Important Make sure the front gable is plumb and the roof sheathing extends 7 pa...

Страница 19: ...lv nails Cut next panel to fit Repeat on other side 3 Starting at the peak install 2 two 42 3 8 long 2x3s between the roof sheathing and the 7 soffit panels Use 6d galv nails on soffit and 7d sinkers...

Страница 20: ...back side of the door When doors are closed this 2x4 will be in the center where doors meet Lay the door with the trim facing up and install 3 three 5 hinges to the right side To position the hinge p...

Страница 21: ...u can move the trim in or out to make the door spacing equal 2 Determine position of hinges and install to side trim with 2 screws 4 Install a barrel bolt on the lower back of the left door to secure...

Страница 22: ...l ventilation Step 28 Install Roofing Not Supplied in Kit 1 Install metal roof edging on the perimeter of the roof area If you are not installing shingles at this time you can purchase felt paper to p...

Страница 23: ...1x4 Wall Trim 72 3 ea 1x3 Door Trim 72 2 ea Pre built Door 32 x 71 1 2 5 Collar Ties 2x4 82 14 Truss Rafters 2x4 80 1 2 48 Wall Studs 2x4 72 4 Wall Plates 2x4 68 1 2 2 Wall Plates 2x4 67 1 2 2 Wall P...