BESEN INTERNATIONAL GROUP CO., LTD.
BESEN-GROUP.COM, leading the EV Charging to a better way
Page 13
Wall-mounted Frame
G3-4 Installation Plate Holes Size for Wall-mounted Installation
3.3 Installation Steps
3.3.1 Pole-stand Charging Station
1.
Select a solid place;
2.
Dig the holes according to the plate size in G 3-2;
3.
Place the charging station on the holes and fasten it.
3.3.2 Wall-mounted Charging Station
1.
Select a place vertical to the ground, like wall or support frame;
2.
Dig the holes in the place according to wall-mounted frame fixing holes size (6*
Φ
7) and
wire-hanging frame fixing holes size (4*
Φ
5.5) in G3-4. Keep them in the same vertical
line;
3.
Fix the wall-mounted frame on the installation place by bolts or concrete nails;
4.
Match the wall-mounted plate and wall-mounted frame (wall-mounted plate and
charging station have been fixed when leaving the factory);
5.
Finally, fix the wire-hanging frame on the installation place.