BERNHARDT design a.k.a. C-base Скачать руководство пользователя страница 5

September 2012 

 

Step 11 

 
To install the next Workwall Structure section, simply lift 

into place and slip the yellow alignment pins into 

corresponding rail of the previous mounted section. Make 

sure that the seam between the two sections is tight 

without gaps. 

 

Repeat Steps 7-11 for the remaining Workwall Structure 

sections. 

 
 
 

 

 
 
 

Step 12 

  
After all Workwall Structure sections have been mounted, 

they then must be shimmed to be made flat and true 

across all of the mounted panels.    

 
 
 

 

 
 
 

Step 13 

 
Place a level or long straight edge along the front surface 

of each of the Workwall rails to show the dips or 

protruding areas. 

 

Warning: If the panel assembly is not flat and free of any 

dips or bulges there may be issues in securing panels or 

hanging components properly. 

 
 
 

 

 
 
 

Step 14 

 
The 

¼

”– 20 bolts use to attached the Workwall sections 

can be loosened and a shim can be added between the 

wall and the Workwall section to bring out any low spots. 

 
 

 
 

Содержание a.k.a. C-base

Страница 1: ...a k a casegoods instructions...

Страница 2: ...re connection to the wall Toggler Snaptoggle or similar high performance anchors we suggest you use the 20 bolt version for added flexibility Workwall Installation Step 1 Identify the highest point of...

Страница 3: ...spot Electrical Workwall Configuration 21 7 8 556mm above the high spot Step 4 Place the first Workwall Structure piece on the height spacer block Step 5 Using the vertical and horizontal laser guide...

Страница 4: ...you can connect the panel to the studs with a 8 or 10 screw Step 8 Once all the holes have been drilled remove the temporary drywall screws and set the first Workwall Structure section aside Using a...

Страница 5: ...sections have been mounted they then must be shimmed to be made flat and true across all of the mounted panels Step 13 Place a level or long straight edge along the front surface of each of the Workwa...

Страница 6: ...he bottom of the panel indicates its position left to right The number on the bottom of the panel indicates its position top to bottom Letter A will be the leftmost panel Number A1 will be the top lef...

Страница 7: ...ull length of the mounting item is engaged into the Workwall Rail Step 19 Once the component is hung make sure that the two extrusions are fully engaged If there are any dips in the Workwall Structure...

Страница 8: ...LED Light Rail is mounted run the low voltage power line behind the overhead unit and to the closest end where it can be run down to the floor before the end caps are installed To secure the power lin...

Страница 9: ...until after all lighting and wiring is completed to do this The low voltage wire from task lights is able to run down the sides of the Workwall and should be taped in place before attaching the Trim C...

Страница 10: ...he glass run off desks can only be mounted to a workwall structural rail Insert the included aluminum mount bracket into workwall rail and let it hang flat Press the back edge of the runoff against th...

Страница 11: ...trations here show the assembly process for connecting a loop or panel support end and a tower to a wood deck panel Mod eez clip installed into the end of the wood deck panel 2 Mod eez post installed...

Страница 12: ...nnecting a wood deck panel to a worksurface tower unit Measure from the top back edge of the tower to locate where the holes are to be drilled for the Mod eez posts Using a 5mm drill bit drill two 13m...

Страница 13: ...just repeat the procedure from page 1 In step 1 take the wood deck panel loop panel end assembly and lift it up so that it will engage into the Mod eez clips Once the assembly is engaged in the clips...

Страница 14: ...an overhead cabinet for connection to a support tower To assemble a loop support to the underside of the overhead you must first pre drill and install the Mod eez posts Use the plastic drill jig prov...

Страница 15: ...om deck assembly and push it slightly behind the assembly Rest the overhead on the loop support with the Mod eez posts aligned in Mod eez clips Step 2 is to push the loop support back until the posts...

Страница 16: ...op shelf pin hole and through the side panel on the overhead Use caution not to blow out the inside face of the overhead Once holes are drilled insert sex bolts and tighten while making sure the front...

Страница 17: ...leg to the outside of the table top To install the upholstered modesty panel locate as per the dimensions shown and attach to the underside of the top with included 8 wood screws making sure to keep...

Страница 18: ...modesty panel align the face of the wood veneer panel to the back or user side of the c base Locate the panel so that it runs parallel to the edge of the top and attach it to the underside of the top...

Страница 19: ...To install the upholstered modesty panel locate as per the dimensions shown and attach to the underside of the top with included 8 wood screws making sure to keep the face of the modesty panel parall...

Страница 20: ...te by dimensions shown To install the upholstered modesty panel locate as per the dimensions shown and attach to the underside of the top with included 8 wood screws making sure to keep the face of th...

Отзывы: