Beretta 20117745 Скачать руководство пользователя страница 13

13

2  INSTALLER

2 .1  Receiving the product

The 

B

 

IDRA HP

 boilers are supplied in a single case, 

protected by a nylon bag and placed on a wooden pallet 

(fig. 4).

The following material is placed inside a plastic bag inside 

the packing:

 - Instruction booklet

 - Hydraulic test certificate

 

b

The instruction manual is an integral part of the boiler 

and it should be read and then kept with care.

2 .2  Handling

The boiler must be handled with equipment that is suitable 

for the weight of the unit (fig. 5).

 - Unscrew the bolt (a) from the bottom of the storage 

cylinder to release it from the pallet

 - To lift the storage cylinder, remove the top cover and 

screw an eyebolt suitable for the weight of the stora-

ge cylinder and welded to a fitting (Ø 1”1/4 not sup-

plied) into the hot water outlet (b)

 - Lift the storage cylinder using a crane or hoist of sui-

table capacity for the weight involved.

 

b

Use adequate accident prevention protection.

 

a

It is forbidden to abandon and leave the packaging 

material within the reach of children as it can be a 

source of risk.

2 .3  Installation on system that are 

old or need restoration

When 

B

 

IDRA HP

 boilers are installed on systems that 

are old or need modernising, check that:

 - The installation is fitted with safety and control devi-

ces in compliance with specific regulations.

 - The system is flushed, clean of sludge, incrustations, 

bled of air, and the hydraulic seals are in order

 - There is a treatment system for particular feeding/

recirculation water (the values indicated in the table 

can be taken as reference values).

REFERENCE VALUES

pH 

6-8

Electrical conductivity

less than di 200 μS/cm (25°C)

Chlorine ions

less than di 50 ppm

Sulphuric acid ions

less than di 50 ppm

Total iron

less than di 0,3 ppm

Alkalinity M 

less than di 50 ppm

Total hardness

less than di 35°F

Sulphur ions

none

Ammonia ions

none

Ioni silicio 

less than di 30 ppm

3  TECHNICAL ASSISTANCE SERVICE

3 .1  Setting up

Before performing the functional test and the starting up of 

the boiler it is essential to check the following:

 - That the non-sanitary hot water circuit water supply 

taps are open (fig. 6)

 -  Eventual water connections to the associated heat 

pump and the hydraulic system of the solar system 

have been made correctly

 -  The washing procedure has been completed correct-

ly and an eventual solar circuit ha been filled with a 

mix of glycol-water, and the air has been bled from 

the system.

3 .2  Maintenance 

The routine maintenance, essential for the safety, the per-

formance and the duration of the boiler, reduces consu-

mption and keeps the product reliable over the years. The 

maintenance must be carried out by the 

B

 Technical 

Service Centre or by professionally qualified personnel, at 

least once each year.

Before performing any maintenance operations:

 - Cut off the electrical power supply  to the componen-

ts of the hydraulic circuit and the associated genera-

tor, setting the master switch on the system and that 

on the boiler control panel to “OFF”

 -  Close the interception devices on the non-sanitary 

hot water system

 -  Empty the boiler, or rather, the secondary circuit of 

the boiler if the primary circuit is present.

3 .3  Cleaning the boiler and 

dismounting the internal 

components

3 .3 .1  Outside

The boiler casing must be cleaned using cloths and soap 

and water.

If there are persistent stains, dampen the cloth with a mix 

of 50% water and denatured alcohol or with specific pro-

ducts.

On completion, dry the boiler.

 

a

Do not use abrasive products, benzene or trichloro-

ethylene.

3 .3 .2  Inside

 - With a wrench, loosen the fixing nuts on the flange 

and extract the counter-flange together with its gasket

 - Clean the inside surfaces, and remove any residue 

through the opening. When the cleaning is comple-

ted, remount all the components by operating in the 

reverse order to that described above.

 

b

Tighten the flange fixing bolts with a “crosswise” ope-

ration, to apply a uniform pressure on the gasket.

 - Fill the boiler circuit and check that the gaskets do 

not leak

 - Carry out a performance check.

Содержание 20117745

Страница 1: ...litori Boilers IDRA HP Manuale Installatore Installation Manual Istruzioni per l installatore e per il servizio tecnico di assistenza Instructions for the installer and the technical service centre IT...

Страница 2: ...termico garanzia di anni 5 bollitori ed accumuli in abbinamento a pannelli solari termici garanzia di anni 5 4 3 La sostituzione o la riparazione dell intero Prodotto o di una sua com ponente non est...

Страница 3: ...Questo libretto di istruzione contiene importanti informazio ni e suggerimenti che devono essere osservati per il miglior uso possibile del bollitore IDRA HP Rinnovati ringraziamenti Beretta GARANZIA...

Страница 4: ...tto Cod Rev composto da pagine 1 GENERALIT 5 1 1 Avvertenze generali 5 1 2 Regole fondamentali di sicurezza 5 1 3 Descrizione dell apparecchio 5 1 3 1 Schema idraulico di principio fig 1 5 1 4 Dati te...

Страница 5: ...accompagnare il bollitore anche in caso di sua cessione ad altro proprietario o utente op pure di un trasferimento su un altro impianto In caso di danneggiamento o smarrimento richiederne un al tro es...

Страница 6: ...C 45 C 0 5 0 8 m h Acqua di riscaldamento 80 C 60 C 4 1 6 7 m h Potenza resa 80 C 60 C 96 156 kW Produzione sanitaria 10 C 45 C 2 4 3 8 m h Tipo d isolamento Poliuretano espanso mm 50 privo di CFC PU...

Страница 7: ...entino 1 1 1 4 11 Mandata acqua calda 1 1 4 1 1 4 12 Attacco bancale cieco 1 2 1 2 b b Il bollitore B IDRA HP non equipaggiato di cir colatori di carico che devono essere opportunamen te dimensionati...

Страница 8: ...e del bollitore indispensabile controllare che I rubinetti dell acqua di alimentazione del circuito ac qua calda non sanitaria siano aperti fig 6 Gli eventuali allacciamenti idraulici alla pompa di ca...

Страница 9: ...pare parts when required this will ensure that your ma chine is maintained at maximum levels of efficiency with consequent lower running costs This instruction manual contains important indications an...

Страница 10: ...y the unit even when this is tran sferred to another owner or user or transferred onto another system If it gets damaged or lost request another copy from the local B Technical Service Centre 1 2 Fund...

Страница 11: ...ction 10 C 45 C 0 5 0 8 m h Heating water 80 C 60 C 4 1 6 7 m h Output power 80 C 60 C 96 156 kW DHW production 10 C 45 C 2 4 3 8 m h Type of insulation Expanded polyurethane mm 50 CFC free Foamed har...

Страница 12: ...ater exchan ger inlet 1 1 1 4 11 Domestic hot water inlet 1 1 4 1 1 4 12 Hole for pallet fixing bolt blind 1 2 1 2 b b The B IDRA HP boiler is not fitted with load circu lators that must be appropriat...

Страница 13: ...3 1 Setting up Before performing the functional test and the starting up of the boiler it is essential to check the following That the non sanitary hot water circuit water supply taps are open fig 6...

Страница 14: ...14 Beretta IDRA HP Q2 1...

Страница 15: ...15 a b 4 5 6 1 2 9 8 6 5 12 4 3 7 10 11 H G F E D C B A I L 30 45 N M 2 3...

Страница 16: ...e i prodotti Questo fascicolo pertanto non pu essere considerato contratto nei confronti di terzi Commercial Offices Via Risorgimento 23 A 23900 Lecco www berettaboilers com Beretta reserves the right...

Отзывы: