
1. Start with one of the two Cables (46). Please refer to related figures on page 22.
a). With the Cable (46) in groove of Pulley (42) through Upper Cross Beam (7).
b). Install Pulley (42) to Upper Cross Beam (7), using one M10x40mm Hex Bolt (67),
two M10 Washers (77) and one M10 Nylon Nut (83).
c). Install Pulley (42) and two Pulley Bushings (45) to Support Frame (8), using one
M10 x 70mm Hex Bolt (63), two M10 Washers (77) and one M10 Nylon Nut (83).
d). Install Pulley (42) to Pulley U (21), using one M10 x 45mm Hex Bolt (66), two
M10 Washers (77) and one M10 Nylon Nut (83).
e). Attach the bolt end of Cable (46) to Pulley Block (20), using one M8 x 25mm Hex
Bolt (72), two M8 Washers (78) and one M8 Nylon Nut (84).
f). Attach the Lat Bar (16) to the eyelet end of Cable (46) using two Carabinas (44)
and Chain (short) (49).
2. Assemble the Weight Cable (47). Please refer to related figures on page 22.
a). Attach the eyelet end of the Weight Cable (47) to Upper Cross Beam (7), using
one M8 x 25mm Hex Bolt (72), two M8 Washers (78) and one M8 Nylon Nut (84).
b). Install Pulley (42) to Pulley Block (20), using one M10 x 45mm Hex Bolt (66),
two M10 Washers (77) and one M10 Nylon Nut (83).
c). Install Pulley (42) to Upper Cross Beam (7), using one M10 x 45mm Hex Bolt
(66), two M10 Washers (77) and one M10 Nylon Nut (83).
d). Attach the threaded bolt end of the Weight Cable (47) to Selector Shaft (6) with
Plastic Washer (39). Tighten securely but do not overtighten.
3. Assemble the Butterfly Cable (48). Please refer to related figures on page 22.
a). Attach both ends of Butterfly Cable (48) to Right & Left Butterfly Arm (9 &10),
using the two M10 x 35mm Hex Bolts (68), two M10 Nuts (86), four M10
Washers (77) and two M10 Nylon Nuts (83).
b). Install Pulleys (42) to the Single Pulley Block (23), using two M10 x 45mm Hex
Bolts (66), four M10 Washers (77) and two M10 Nylon Nuts (83).
c). Install Pulley (42) to Reverse U (22), using one M10 x 45m Hex Bolt (66), two
M10 Washers (77) and one M10 Nylon Nut (83).
4. Assemble the remaining Cable (46). Please refer to related figures on page 22.
a). With the Cable (46) in groove of Pulley (42) through Leg Extension Frame (5).
b). Install Pulley (42) and two Pulley Bushings (45) to Leg Extension Frame (5),
using one M10 x 70mm Hex Bolt (63), two M10 Washers (77) and one M10
Nylon Nut (83).
c). Install Pulley (42) and two Pulley Bushings (45) to Support Frame (8), using one
M10 x 70mm Hex Bolt (63), two M10 Washers (77) and one M10 Nylon Nut (83).
d). Install Pulley (42) to Reverse U (22), using one M10 x 45mm Hex Bolt (66), two
M10 Washers (77) and one M10 Nylon Nut (83).
e). Install Pulley (42) to Base Frame (2), using one M10 x 45mm Hex Bolt (66), two
M10 Washers (77) and one M10 Nylon Nut (83).
f). Install Pulley (42) to Pulley U (21), using one M10 x 45mm Hex Bolt (66), two
M10 Washers (77) and one M10 Nylon Nut (83).
g). Attach the eyelet end of Cable (46) to Base Frame (2), using one Chain (long)
(32), one Carabiner (44), one M8 x 25mm Hex Bolt (72), two M8 Washers (78)
and one M8 Nylon Nut (84).
h). Attach Low Bar (17) or Ankle Strap (28) to the other end of Cable (46), using
one Chain (long) (32) and two Carabinas (44).
7.
Please pre-load the Cabling
System when fully assembled
by using the Chain (32) to
remove all Cable slack by
selecting the most appropriate
link.
Do not overtighten any of
the Pulleys during assembly.
Ensure that they are free to
move, but not loose and that
the fixing bolts and nuts are
secure.
Page
Содержание Herculean V-FIT STG/09-2
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 24: ...1 2 3 4 5 6 7 8 9 10 11 13 12 46 47 48 46 Page...
Страница 27: ...Page...