11
9
10
30
33
33
75
75
81
81
14
14
50
50
56
56
65
65
77
77
NOTE: 4 x Oil Bushing (big) (33) have been pre-installed onto the Right &
Left Butterfly Arms (9 & 10).
1. Remove the two top Oil Bushing (big) (33), two M16 Washers (75) and
two M16 Nylon Nuts (81).
2. Attach the Right & Left Butterfly Arms (9 & 10) to the Press Bar (11),
refitting the four Oil Bushing (big) (33), two M16 Washers (75) and two
M16 Nylon Nuts (81).
NOTE: Tighten securely to remove excess slack but ensure free-movement.
3. Slide two Arm Foam Rollers (30) onto the Right & Left Butterfly Arms (9 & 10).
4. Attach the Handle Tube (14) to the Right & Left Butterfly Arms (9 & 10),
using two M10x50mm Hex Bolts (65) and two M10 Washers (77).
NOTE: These can be fitted into either the Upper or Lower and either Inside or
Outside locations on the Butterfly Arms (9 & 10) to allow for Wide or Narrow
Grip exercises.
5. Slide two Mid-empty Square Plugs (50) and two Handle Grips (56) onto
the Right & Left Butterfly Arms (9 & 10).
Fully tighten the 2 x M16
Nylon Nuts (81) then
"back off" 1/4 turn to ensure
smooth movement of the
Pec Arms.
Note
Upper holes in the Pec Arms
(9) are for alternative fitment
of the Handle Tubes (14) which
can be fitted either inside or
outside of the Pec Arm tubes.
Note
Page
0
Содержание Herculean V-FIT STG/09-2
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 24: ...1 2 3 4 5 6 7 8 9 10 11 13 12 46 47 48 46 Page...
Страница 27: ...Page...