12
Bentone BG700M,800M,950M
General
2. General instruktions
2.1 General instructions
The installation of the gas burner must be carried out in accordance with
current regulations and standards. The installers of gas burners should
therefore be acquainted with all regulations and ensure that the installation
complies with the requirements. The installation, mounting and adjustment
should be made with the greatest care and only the correct gas should be
used.
2.2 Operating instructions
The operating instructions accompanying the burner should be left in a
prominent position in the boiler room.
2.3 Instructions
The user should be thoroughly in-structed in the function of the gas burner
and the whole installation. The supplier must instruct the user.
2.4 Inspection and maintenance
Daily inspection is advisable..
2.5 Start up
After the burner has been itted to the boiler and the electric connection, the
leakage control, the venting and the electric function test have been carried
out, the burner will be ready for start-up.
Howerer, study the sections dealing with adjustments of multi-bloc,
combustion air and combustion head. Open the ball valve and switch on the
main switch. If the burner starts the actual adjustment can be made.
2.6 Commissioning of installation
Control of the combustion. The combustion quality is checked by means of a
lue gas analysis device. Adjust the burner to appr. 20%
excess air in accordance with the table. Check the lue gas temperature.
Calculate the eficiency. Check also the actual gas volume on the gas meter
so that the correct input is achieved.
Содержание BG 700
Страница 2: ......
Страница 20: ...20 Bentone BG700M 800M 950M General 5 1 Wiring diagram LFL1...
Страница 40: ......
Страница 41: ......
Страница 42: ......
Страница 43: ......
Страница 44: ...Enertech AB P O Box 309 SE 341 26 Ljungby www bentone se www bentone com...