background image

37

 

Bentone 

9.3  Komponentlista /LMO24.255... (B55-2H,R/B65-2H,R)

A1 

Burner control

B1 Photoresistor
F1 

Operating fuse

F2 

Operating fuse

F3 

Operating fuse

H1  Alarm lamp
H2  Signal lamp (optional)
H5  Alarm signal 230V 
K1 

Thermal overload 
protection 

M1  Burner motor
M2  Damper motor
P1 

Time meter, low capacity 
(optional)

P2 

Time meter, high capacity 

(optional)

S1 

Operating switch

S2 

Operating switch, high/low 
capacity

S3 

Operation thermosta

S4 

Temperature limiter

S5 

Micro switch for hinged door

S6 

S6 Control thermostat, high/
low

S7 

Main switch 3-fas

S20  Main switch 1-fas
T1 

Ignition transformer

X1 

Connection terminal board

X2 

Earth terminal

X3 

Plug-in contact ”Euro” burner

X4 

Plug-in contact ”Euro”, boiler

X5 

Plug-in contact ”Euro” high/
low burner

X6 

Plug-in contact ”Euro”, high/
low boiler

X7 

Plug-in contact ”Euro” 
3-phase, burner

X8 

Plug-in contact ”Euro”, 
3-phase, boiler

Y1 

Solenoid valve 1

Y2 

Solenoid valve 2

Y1 

Magnetventil 1

Y2 

Magnetventil 2

If S6 is missing connection between 
T6 and T8. Mains connection and 
fuse in accordance with local regu-
lations.

9.3.1  Function LMO24

1

Switch on operating switch and twin thermostat

A spark is formed. The air damper motor opens the damper to low 
load position. The burner motor starts, the prepurge goes on till the 
prepurge period expires and the solenoid valve 1 opens (2).

2.

Solenoid valve 1 opens

Oil mist is formed and ignited. The photocell indicates a flame. The 
ignition spark goes out after flame indication (See Technical data oil 
burner control). 

3.
a

b

The safety time expires

If no flame is established before this time limit the control cuts out.
If for some reasons the flame disappears after this time limit, the 
burner will make an attempt to re-start.

4

High/Low thermostat ON

The burner is in operating position and can now change between 
full load and low load.

4-5

Operating position

If the burner operation is interrupted by means of the main switch 
or the thermostat, a new start takes place when the conditions in 
accordance with point 1 are fulfilled.

The oil burner control cuts out

A red lamp in the control is lit. Press the reset button and the 
burner re-starts.

Technical data oil burner control

LMO24.255...

Pre-ignition time:

25 s

Pre-purge time:

26 s

Post-ignition time:

5 s

Safety lock-out time:

< 5 s

Reset time after lockout:

< 1 s

Reaction time on flame failure:

< 1 s

Ambient temperature:

-20 - +60°C

Min. current with flame established:

45 µA dc

Max. photo current at start:

5,5 µA dc

Содержание B 55-2

Страница 1: ...Providing sustainable energy solutions worldwide 178 072 66 1 2019 09 26 Installation and maintenance instruction B 55 B65 Original translation of Installation and maintenance instruction...

Страница 2: ...le Beispiel exempel Manuels dans d autres langues www bentone com download ou scannez le code QR Saisir le num ro d article du br leur sur votre plaque signal tique consultez l illustration et s lecti...

Страница 3: ...21 5 8 Hydraulic air adjustment __________________________ 22 5 9 Air setting_______________________________________ 22 6 Maintenance________________________________________ 23 6 1 Servicing the burne...

Страница 4: ...elative humidity no condensation Temperature 20 to 60 C Check that the burner is compatible with the boiler s output range The label information on the rating plate refers to the burner s minimum and...

Страница 5: ...tch this must be equipped with a hatch opening switch connected to the burner s safety system When in operation the burner s noise level can exceed 85 dBA Use hearing protection The burner must not be...

Страница 6: ...h Change cleaning Brake plate 1 Year Change cleaning 3000h Change cleaning Motor 1 year 3000 hrs Cuppling chaft 1 year control change 3000h control change Fan wheel 1 Year Change when dirty unbalance...

Страница 7: ...blend as defined in DIN V51603 6 and is used for Water heating generators Hot air generators these require LMO 24 255 C2E 2 1 Dimensions B 55 B65 H I A D E F G B C Type Motor supply Main supply Sound...

Страница 8: ...ing field B 55 2 13 0 67 5 kg h 155 800 kW 2 3 Working field B 55 3R 13 0 64 0 kg h 155 760 kW 2 4 Working field B 65 2 22 0 99 5 kg h 260 1180 kW 2 5 Working field B 65 3R 24 0 99 0 kg h 285 1170 kW...

Страница 9: ...bar 8 25 bar depending on pump model Because of the various boiler types with varying furnace geometries and furnace loads it is impossible to commit to a certain scattering angle or a specific distri...

Страница 10: ...6 195 5 00 18 62 220 190 19 52 231 199 20 39 242 208 21 22 252 216 5 50 20 48 243 209 21 47 255 219 22 43 266 229 23 34 277 238 6 00 22 34 265 228 23 42 278 239 24 47 290 250 24 46 302 260 6 50 24 20...

Страница 11: ...84 259 223 5 00 22 03 261 225 22 79 270 232 23 55 279 240 24 27 288 247 5 50 24 23 287 247 25 07 297 256 25 91 307 264 26 70 317 272 6 00 26 43 313 270 27 49 326 280 28 27 335 288 29 13 345 297 6 50...

Страница 12: ...10 Fuse 11 Indicating lamp Stage 3 12 Switch ll llll 13 Indicating lamp Stage 2 14 Switch l ll 15 Indicating lamp Stage 1 16 Switch 0 l 17 Motor 18 Adjustment device air damper 19 Scale air regulatio...

Страница 13: ...former 35 Photocell 36 Ignition wires 37 Air damper 38 Air intake 39 Solenoid valve bloc Stage 2 40 Connecting pipe 41 Solenoid valve 42 Adjustment device Nozzle assembly 43 Nozzle assembly adjustment...

Страница 14: ...ntenance 3 1 1 Installation and maintenance instructions The maintenance instructions supplied with the burner must be kept at an easily accessible location in the boiler room 3 1 2 Instructions The u...

Страница 15: ...15 Bentone 4 Installation 4 1 Handling and lifting instruktion figure 1 Option The lifting aid we used here are available as spare parts Figure 1...

Страница 16: ...aning filters are recommended for oils of a higher viscosity or oils that contain significant impurities Oil affected parts shall be selected in materials that are capable of withstanding the medium s...

Страница 17: ...boiler door to reduce radiated heat 9 Install the burner body on the flange 10 Lock the burner body using with the nut nuts 11 Connect the oil pipes to the pump refer to the chapter servicing of burn...

Страница 18: ...ge 2 15 Damper motor Closed 0 Blue cam Stage 1 25 Orange cam MV 2 40 Black cam Stage 2 50 Red cam The black cam for Stage 2 MV 2 must be placed between the cams for Stage 1 and Stage 2 The positions o...

Страница 19: ...a matter of a basic setting that should be adjusted retrospectively once the burner has started A flue gas analysis and soot quantity measurement must be carried out when fine tuning the burner Recome...

Страница 20: ...y B55 Insert scale 5 3 Set values for nozzle assembly B65 5 4 Set values for air damper B55 5 5 Set values for air damper B65 Insert scale Air 0 15 30 45 60 75 90 100 200 300 400 500 600 700 800 Air 0...

Страница 21: ...Stage 1 and Stage 2 by means of a hydraulic piston Three nozzles Nozzle assembly regulation adjusts the position of the brake plate between Stage 2 and Stage 3 by means of a hydraulic piston Low load...

Страница 22: ...duce or out to increase The position of the dam per can be read from the damper scale G Carry out flue gas analysis to check the air settings 5 9 Air setting When the burner s power stage has been sel...

Страница 23: ...together and secure with the nuts H 10 Open the boiler spectacle flange to access the burner pipe 11 Remove and clean the burner pipe 12 Install the burner pipe make sure you install the drainage hol...

Страница 24: ...intake Lubricate the damper shaft if applicable 6 Re engage the damper motor 7 Fit the intake grille over the air intake 8 Slide the burner together and secure it with the nuts E 9 Connect the Eurost...

Страница 25: ...t is important that the screw is at right angles to the plane of the shaft 10 Release the damper motor and lock it at 30 11 Fit the mounting plate by guiding the link arm into the attachment point on...

Страница 26: ...K 5 Transfer the pump coupling to the new pump and adjust to give the same spacing between the pump and pump coupling as before K 6 Fit the oil pump on the burner and tighten the screws J It is import...

Страница 27: ...the combustion Use caution when operating the burner surfaces may be hot 6 6 Check oil line seals Once the burner has been installed and commissioned the seals of the various coupling elements should...

Страница 28: ...ibration level are 5 0 mm s Check all bolts and nuts for correct torque Check fan wheel for damage and contamination Change when dirty unbalanced Check motor bearings If worn change motor bearings Use...

Страница 29: ...t the operating switch to Stage 2 II Reduce the air volume Turn orange cam towards 0 Increase the air volume Turn orange cam towards 90 Adjust the operating switch back to low capacity and check Stage...

Страница 30: ...check Stage 2 Adjust the operating switch to Stage 1 I Reduce the air volume Turn orange cam towards 0 Increase the air volume Turn orange cam towards 90 If the orange cam is moved change the black ca...

Страница 31: ...capacity 225 l h 294 l h Max pressure on the suction and return side 4 bar 7 3 Mounting dismounting by pass plug In a 2 pipe system excess oil is led back direct to the oil tank In a 1 pipe system the...

Страница 32: ...and produces a drop in the oil pressure The spring in the regulating valve presses the regulating piston forward until it seals in port P This cuts off the oil flow to the nozzle and ensures that the...

Страница 33: ...l quality according to current standards On commissioning with an empty tube system the oil pump should not be run without oil for more than 5 min a condition is that the pump is being lubricated duri...

Страница 34: ...same wiring as the existing component or the specified alternative arrangement 5 Turn on the mains power 6 Check the function of the new component 7 Start the burner Check combustion Note When servici...

Страница 35: ...35 Bentone 165 205 41 9 Oil burner control 9 1 Wiring diagram LMO24 255 B55 2H B65 2H...

Страница 36: ...36 Bentone 9 2 Wiring diagram LMO24 255 B55 2H R B65 2H R...

Страница 37: ...at A spark is formed The air damper motor opens the damper to low load position The burner motor starts the prepurge goes on till the prepurge period expires and the solenoid valve 1 opens 2 2 Solenoi...

Страница 38: ...by pressing and holding the reset button for 3 seconds The number of flashes below is repeated with a pause in between 2 flashes No flame signal when safety time expires 4 flashes False light during s...

Страница 39: ...ent light Check high voltage wiring and ignition electrodes Check preheater function Symptom Burner does not start Burner pre ventilates Burner stops Causes Fuse blown Boiler thermostat has not reset...

Страница 40: ...ht Adjust the burner Check preheater function Adjust the preheater s set operating temperature Ensure that the new oil s physical parame ters are within the limits for which the burner is designed If...

Страница 41: ...Address Test performed by Postal address Company name Tel no Boiler Type Make Power kW Bentone Burner Type Model Serial no Fuel Step 1 Step 2 Step 3 Draught in fireplace Fan Press mbar Filter smoke nu...

Страница 42: ...perature If the burner will not start Press the reset button on the relay Check that the thermostats are correctly adjusted Don t forget the room thermostat check that any fusesare intact and main swi...

Страница 43: ...171 905 28...

Страница 44: ...Enertech AB P O Box 309 SE 341 26 Ljungby www bentone se www bentone com...

Отзывы: