Q7T3-FP737S-Dual function LCD Monitor Service
Engineering Specification
7
Confidential
Duration : 3ms
Acceleration(G) : 75G
2.3 Packing Configuration
2.3.1 Container Specification
a. Shipping Container
Container Type
20'*8'*8'6
" Steel
40'*8'*8'6" Steel
40'*8'*9'6"
High Cube Steel
Gross
24,000
30,480
30,480
Weight (Kegs)
Tare
2,370
4,000
4,200
Payload
21,630
26,480
26,280
Length 5,898 12,031
12,031
Width 2,352 2,352
2,352
Interior Measurement (mm)
Height 2,394 2,394
2,699
Volume (Cubic Meter)
33.2
67.74
76.4
Width 2,340 2,340
2,340
Door opening (mm)
Height 2,280 2,280
2,585
Length 5,890 12,000
12,000
Width 2,330 2,330
2,330
Useable Interior Dimension
(Deducted pallet (130mm
& Operating space 50mm)
Height 2,100 2,100
2,405
b. Air Transport
Container (1)
Container (2)
Container (3)
Container Type
125"*96"*96" 125"*96"*118" 125"*88"*64"
Gross 6,804
6,804
4,627
Weight (Kegs)
Tare
129
129
129
Payload 6,675
6,675
4,498
Length 3,048
3,048
3,048
Width 2,260
2,260
2,082
Interior Measurement
(mm)
Height 2,438
2,997
1,625
Содержание Q7T3-FP737S
Страница 8: ...Q7T3 FP737S Dual function LCD Monitor Service Guide Alignment Procedure 8 Confidential...
Страница 48: ......
Страница 49: ......
Страница 60: ...Q7T3 AUO Panel LCD Monitor Service Guide Alignment Procedure 6 b LVDS Cable with tape c Lamp wire with clip...
Страница 62: ...Q7T3 AUO Panel LCD Monitor Service Guide Alignment Procedure 8 f Spacer g Signal cable with clip...
Страница 63: ...Q7T3 AUO Panel LCD Monitor Service Guide Alignment Procedure 9 h Bracket Cover i Plug under AC socket...
Страница 67: ...Q7T3 AUO Panel LCD Monitor Service Guide Alignment Procedure 13 b C603 C604 L606 L607 c C615...
Страница 91: ......
Страница 92: ......
Страница 110: ...Q7T3 CPT Panel LCD Monitor Service Guide Alignment Procedure 5 Fig 1 Factory Mode On Fig 2a Burn In Mode Button...
Страница 111: ...Q7T3 CPT Panel LCD Monitor Service Guide Alignment Procedure 6 Fig 2b Burn In Mode ON 2 Wire Dressing a RSDS Cable...
Страница 113: ...Q7T3 CPT Panel LCD Monitor Service Guide Alignment Procedure 8 d Al Foil Mylar on the shielding cover e Spacer...
Страница 114: ...Q7T3 CPT Panel LCD Monitor Service Guide Alignment Procedure 9 f Signal cable with clip g Bracket Cover...
Страница 115: ...Q7T3 CPT Panel LCD Monitor Service Guide Alignment Procedure 10 h Plug under AC socket i Main Grounding Wire...
Страница 118: ...Q7T3 CPT Panel LCD Monitor Service Guide Alignment Procedure 13 3 Add Glue a C605 b C603 C604 L606 L607...
Страница 119: ...Q7T3 CPT Panel LCD Monitor Service Guide Alignment Procedure 14 c C615...