Q7T3-FP737S-Dual function LCD Monitor Service
Engineering Specification
14
Confidential
3.5.2 Output Power Requirement
The power circuit shall supply DC power outputs as followings:
Output
Nominal Regulation Load Current Range
1 5V-panel ±10% 0 ~ 1.0A
2 3.3V-Fix ±5% 0 ~ 1.0A
3.5.3 Power Management
Mode H/Vsync
Power
consumption
LED Color
(Status)
Recovery
Time
Normal
Both exist
< 40W
Blue
(Normal)
--
off
None or
Only one exist
< 1W
, under 115Vac
<
2W, under 264Vac
Amber
< 3 sec
3.6 Specification of Inverter
The backlight system is an edge-lighting type with 4 CCFLs (Cold Cathode Fluorescent Tube).
The characters of dual lamps are shown in the following tables.
ITEM SYMBOL
MIN TYP MAX Unit
Condition
Lamp Voltage
VL
-- 650 -- V
IL=6.5 mA
Lamp Current
IL
2.5 6.5 7 mA
Each
Lamp
Inverter Frequency
FL
40 60 70 kHz
1250 --
--
V
Tb=0
o
C
Starting lamp voltage
VS
1000
--
--
V
Ta=25
o
C
Lamp life time
LT
50,000 --
--
Hr
Ta=25
±
2
o
C
NOTE: 1.All condition are at 25C ambient unless otherwise specified.
2. Load Panel=SXGA 17”
Содержание Q7T3-FP737S
Страница 8: ...Q7T3 FP737S Dual function LCD Monitor Service Guide Alignment Procedure 8 Confidential...
Страница 48: ......
Страница 49: ......
Страница 60: ...Q7T3 AUO Panel LCD Monitor Service Guide Alignment Procedure 6 b LVDS Cable with tape c Lamp wire with clip...
Страница 62: ...Q7T3 AUO Panel LCD Monitor Service Guide Alignment Procedure 8 f Spacer g Signal cable with clip...
Страница 63: ...Q7T3 AUO Panel LCD Monitor Service Guide Alignment Procedure 9 h Bracket Cover i Plug under AC socket...
Страница 67: ...Q7T3 AUO Panel LCD Monitor Service Guide Alignment Procedure 13 b C603 C604 L606 L607 c C615...
Страница 91: ......
Страница 92: ......
Страница 110: ...Q7T3 CPT Panel LCD Monitor Service Guide Alignment Procedure 5 Fig 1 Factory Mode On Fig 2a Burn In Mode Button...
Страница 111: ...Q7T3 CPT Panel LCD Monitor Service Guide Alignment Procedure 6 Fig 2b Burn In Mode ON 2 Wire Dressing a RSDS Cable...
Страница 113: ...Q7T3 CPT Panel LCD Monitor Service Guide Alignment Procedure 8 d Al Foil Mylar on the shielding cover e Spacer...
Страница 114: ...Q7T3 CPT Panel LCD Monitor Service Guide Alignment Procedure 9 f Signal cable with clip g Bracket Cover...
Страница 115: ...Q7T3 CPT Panel LCD Monitor Service Guide Alignment Procedure 10 h Plug under AC socket i Main Grounding Wire...
Страница 118: ...Q7T3 CPT Panel LCD Monitor Service Guide Alignment Procedure 13 3 Add Glue a C605 b C603 C604 L606 L607...
Страница 119: ...Q7T3 CPT Panel LCD Monitor Service Guide Alignment Procedure 14 c C615...