background image

 

 
 
 
 
 

 

 

5

 

Connect the EPDM mat inlet and outlet. In case of using 50mm PVC, use PVC glue. The ideal 
location of the EPDM mats is just after the filter, before the heatpump. In all cases, the water 
treatment has to be done after the heating mats, never before. We recommend to use a  
(automated) 3-way valve to bypass the solar heating in case the roof temperature is colder than 
the pool water temperature.  See the connection scheme. 

 
                                           

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Safety Precautions 

 
Do not put the EPDM heating in a environment higher than 60 degC 
Do not pressure higher than 1.5 bar on the EPDM heating 
Do not circulate water with pH lower than 7.2 or higher than 7.6 through the heating mats. 
Do not ciruclate water with free chlorine content higher than 1ppm over the heating mats. 
Do not walk over the collectors 
Use appropriate safety precautions / equipment when working in height 
 

Winterizing 

Empty the collectors before winter. EPDM rubber will not freeze, the collectors will freeze when left full 
with water. 
 
 

 

Temp

 

Temp

 

Отзывы: