113
Launching
L
AUNCHING
RE COMME NDATIONS
A lot of skill and care is required to commission your BENETEAU boat. The proper working of all your boat equipments in the
future results from the quality of the commissioning operations.
In order to remain completely under guarantee in the case of any failure of parts or materials the first launching and the first trials of
different equipment must be carried out by your BE NETEAU dealer.
If later you have to launch your boat yourself, you should take the following precautions:
B
E F ORE
LAUNCHING
- If your boat is to be fitted with sounder and speedometer, allow for the relevant fittings and their installation.
- Check the water intake strain box for cleanliness.
- Check the engine and reduction gear oil levels (refer to engine manual).
- Turn off the engine cooling water drain valves.
- Retract the speedometer into its housing (it may be damaged by the handling belts).
- For the on-line engines, check the anode at the end of the shaft is in place. Check the nut tightening (the lock washer shall
be turned over onto the nut). The anode shall not be painted.
- Turn off all the water inlet and drain valves (sink, washbasin, heads, engine).
H
ANDLING
- Install a fore rope, a rear rope and fenders.
- When craning, check that no device is crushed by the belts (sounder, speedometer, shaft, etc.).
- Locate the strap positions using the stick-on markers. The belt position will be useful during the craning for a future
launching.
W
ARNING
-Do not stay on board or under the boat during
hoisting.
P
IE CE
OF
ADVICE
-
R
E COMME NDATION
-The proper working of all your boat equipments
in the future results from the quality of the
commissioning operations.
Содержание FIRST 35
Страница 1: ...FIRST 35 Code 091962 Owner s Manual ...
Страница 2: ......
Страница 4: ......
Страница 7: ...3 Introduction HISTORY OF UPDATES Index A 08 2009 ...
Страница 8: ......
Страница 10: ......
Страница 11: ...7 General specifications Technical specifications Certification Design category Your boat 1 ...
Страница 26: ...22 Safety Use of the manual bilge pump Lay out of Operation ...
Страница 28: ...24 Safety Acces to sector ...
Страница 30: ......
Страница 31: ...27 Hull Maintenance of the Hull Carreening 3 ...
Страница 32: ...28 Hull Carreening Wetted area 27 5 m ...
Страница 34: ......
Страница 35: ...31 Deck Navigation Stability Prevention of manoverboard Mooring Towing Anchoring Maintenance of the Deck 4 ...
Страница 42: ......
Страница 44: ......
Страница 45: ...41 Steering system Steering Gear 5 ...
Страница 46: ...42 Steering system Steering Gear ...
Страница 47: ...Steering system 5 43 Detail B Detail C Detail D ...
Страница 51: ...47 Rigging and Sails Standing rigging Running rigging Winches Sail setting Sails 6 ...
Страница 52: ...48 Rigging and Sails Rigging Cruising DWL 1 2 3 4 5 ...
Страница 54: ...50 Rigging and Sails Rigging Racing carbon DWL DWL 1 2 3 DWL 4 5 ...
Страница 67: ...63 Fittings Introduction Interior maintenance Maintenance of fabrics 7 ...
Страница 68: ...64 Fittings INTRODUCTION Fittings ...
Страница 72: ......
Страница 73: ...69 Water and sewage water Water tank Water system Distribution Water system Drainage Sewage 8 ...
Страница 78: ......
Страница 84: ......
Страница 85: ...81 Electrical equipment General information 12 V DC system 110 220 VAC system Equipment 9 ...
Страница 86: ...82 Electrical equipment Schematic diagram 12V T 30 ma 40A 220 Volts 50Hz ...
Страница 96: ...92 Electrical equipment Schematic diagram 220V 32A 220 Volts 50Hz 220 Volts 50Hz T 30 ma 32A 220 Volts 50Hz ...
Страница 98: ...94 Electrical equipment Electronics Transducer location View interior View Outside ...
Страница 100: ......
Страница 101: ...97 Engine General information Engine fitting 10 10 ...
Страница 102: ...98 Engine Fuel tank Fuel filler Gauge Electrical panel Refer to the instructions for use ...
Страница 104: ...100 Engine ENGINE FITTING ...
Страница 105: ...101 Engine 10 10 ...
Страница 106: ...102 Engine ...
Страница 115: ...111 Launching Launching recommendations Stepping the mast 11 11 ...
Страница 116: ...112 Launching POSITION OF HOISTING CRADLE AND STRAPS ...
Страница 119: ...115 Winter Storage Laying up Protection and maintenance 12 12 ...
Страница 120: ......
Страница 122: ......