PRIOR TO DELIVERY
_____ Hose test all ports, deck hardware, chain plates, and stanchion posts for leaks.
_____ Tighten lifelines and tape split rings.
_____ All doors, drawers, floorboards, hatches, and cabinets operate freely - fit if necessary.
_____ Clean thoroughly: sinks, bulkheads and counter tops, all lockers and drawers, bilge, cushions,
deck and cockpit lockers.
_____ Dry the bilge completely.
_____ Clean and oil exterior teak if needed.
_____ Clean cabin sole, deck area and ports.
_____ All Coast Guard and safety gear aboard.
_____ Sails bent on, ALL HEADSAILS (AND MAINSAIL) FIT FURLING. Operate freely.
_____ All electronics and optional gear tested and working.
DELIVERY TO OWNER
_____ Walk through the boat with manuals and owner, showing operation of all components.
_____ Test sail boat with owner showing all operations.
_____ Fill out warranty certificates.
Содержание 323
Страница 26: ...BENETEAU 323 Page 26 of 85 Apr 01 2004 rev 00 XI INTERIOR LAYOUT LAYOUT ...
Страница 31: ...BENETEAU 323 Page 31 of 85 Apr 01 2004 rev 00 ...
Страница 39: ...BENETEAU 323 Page 39 of 85 Apr 01 2004 rev 00 MAINSHEET LAYOUT ...
Страница 46: ...BENETEAU 323 Page 46 of 85 Apr 01 2004 rev 00 ...
Страница 48: ...BENETEAU 323 Page 48 of 85 Apr 01 2004 rev 00 SEACOCK AND THRU HULL LAY OUT 1 4 3 2 5 7 9 10 11 12 6 8 13 ...
Страница 50: ...BENETEAU 323 Page 50 of 85 Apr 01 2004 rev 00 WASTE TANK LOCATION WASTE TANK 50L 13 US gal ...
Страница 59: ...BENETEAU 323 Page 59 of 85 Apr 01 2004 rev 00 t ...
Страница 62: ...BENETEAU 323 Page 62 of 85 Apr 01 2004 rev 00 LAY OUT OF THE CONDUITS IN HULL IN DECK ...