Fig. 7 Sectional view of the combustion chamber
Fig. 6 - description:
1. burner
2. side of the ceramic reflector with opening
3. side of the ceramic reflector without opening
4. ceramic reflector body (2 pcs)
5. secondary air inlet
6. ceramic plate (2 pcs)
7. upper beams
6.4. Check before use
Before the boiler is set into operation it is important to carry out/check the following:
a)
filling of the heating system with water
Necessary to ensure thorough filling the boiler and the entire heating system water and its
proper venting.
When filling the boiler heating water should be kept in mind that the boiler body is
composed of two interconnected vessels hill (combustion c exchanger), so you need to fill
both of these vessels separate holes
– see fig. 5, poz. 4 a 5.
The water used in the heating system must be clear and colourless, without suspended substances,
oils and chemically aggressive substances. The wa
ter hardness must satisfy the standard ČSN 07
1
2
3
4
5
6
7
Содержание R100
Страница 1: ...1 SERVICE AND INSTALLATION MANUAL FOR CENTRAL HEATING BOILER BENEKOV R100 ...
Страница 8: ...Fig 2 Basic dimensions of BENEKOV R100 boiler ...
Страница 9: ...Fig 3 Basic dimensions of BENEKOV R100 boiler with additional module of fuel bin ...
Страница 30: ...30 Declaration of conformity of boiler BENEKOV R 100 ...
Страница 31: ...31 Original ES declaration of conformity of boiler BENEKOV R 100 ...