- 27 -
7.
When removing the flange (8) remove the ignition coil (12) from the bushing.
8.
Place the disassembled parts in a safe place taking extra care with the ignition coil.
9.
Locate and loosen the locking bolt (5). If you cannot see the bolt, manually rotate the outer pipe (1) in
direction marked "Z" until you see it.
10. To remove the pipe (1) turn it in the direction marked "O".
11. Remove the pipes (1) and (2) from the burner.
12. Clean both pipes. If necessary clean also the aeration holes in the pipe (2).
13. After the pipes are clean proceed with installation of the burner.
14. Place the combustion pipe (2) into the outer pipe (1)
– ensure the catch (4) is correctly positioned into
the groove (3) with indentation.
15. Place both pipes into the burner and ensure the pipe catches (1) fall into the hooks (11).
16. Turn the pipe in the direction marked "Z" until is stops.
17. Position the pipes so the locking bolt (5) can be tightened.
Fig 11 Cleaning of the tubular aeration rotary chamber
– view 1
Содержание K14
Страница 1: ...BOILER OPERATION AND INSTALLATION GUIDE BENEKOV K14 BENEKOV K20 BENEKOV K25 ...
Страница 9: ... 9 Fig 3 BENEKOV K14 boiler basic dimensions ...
Страница 10: ... 10 Fig 4 BENEKOV K20 and K25 boiler dimensions ...
Страница 17: ... 17 Fig 7 Position of the K14 boiler in a boiler room ...
Страница 33: ... 33 Fig 17 Diagram of electrical connection of XS20 burner of the K14 boiler ...
Страница 34: ... 34 Fig 18 Diagram of electrical connection of XS26 burner of the K20 and K25 boilers ...