
SP-7XE/F Full-Rise Scissor Lift
20
P/N 5900010 — Rev. B — June 2022
Not all components shown. There must be 4.25 inches of Concrete
below
the bottom of the
Concrete Cutouts. In this drawing, the Console would be on the left.
The Flush-Mount Lift settings for the
SP-7XEF
are:
•
Length
. The Length of each SP-7XEF Frame Base is 106 inches / 2,692 mm; add 1 inch / 25 mm
to get
~107 inches / 2,718 mm
.
•
Width
. The Width of each SP-7XEF Frame Base is 22 inches / 559 mm; add 1 inch / 25 mm to
get
~23 inches / 584 mm
.
•
Depth
. The Lowered height of each SP-7XEF Frame is
6.4 inches / 163 mm
. You do
not
add
an extra inch to this value.
•
Distance Between
. The two SP-7XEF Bases can be from
38 to 44 inches / 965 to 1,118
mm
apart. You do
not
add an extra inch to this value.
•
Important
: If you are installing the SP-7XEF over a pit,
do not
set the
Distance Between
to
the width of the pit if the width of the pit is less than 38 inches or more than 44 inches. The two
Bases must be from 38 to 44 inches apart, even if installed over a Service Pit.
•
Distance to Console
. The supplied Hydraulic Hoses allow the Console to be up to
40 inches / 1016 mm
from the nearest Base. You do
not
add an extra inch to this value.
⚠
CAUTION
If you create your Concrete Cutouts and then change your mind about the Distance
Between or find out you made a mistake with one of the dimensions, it is very difficult
to fix.
BendPak strongly recommends double checking your plans
several times before pouring your Concrete Cutouts
.
Содержание SP-7XE
Страница 56: ...SP 7XE F Full Rise Scissor Lift 56 P N 5900010 Rev B June 2022 Labels ...
Страница 57: ...SP 7XE F Full Rise Scissor Lift 57 P N 5900010 Rev B June 2022 ...
Страница 58: ...SP 7XE F Full Rise Scissor Lift 58 P N 5900010 Rev B June 2022 Parts Diagrams ...
Страница 59: ...SP 7XE F Full Rise Scissor Lift 59 P N 5900010 Rev B June 2022 ...
Страница 60: ...SP 7XE F Full Rise Scissor Lift 60 P N 5900010 Rev B June 2022 ...
Страница 61: ...SP 7XE F Full Rise Scissor Lift 61 P N 5900010 Rev B June 2022 ...
Страница 62: ...SP 7XE F Full Rise Scissor Lift 62 P N 5900010 Rev B June 2022 ...
Страница 63: ...SP 7XE F Full Rise Scissor Lift 63 P N 5900010 Rev B June 2022 ...
Страница 64: ...SP 7XE F Full Rise Scissor Lift 64 P N 5900010 Rev B June 2022 ...
Страница 65: ...SP 7XE F Full Rise Scissor Lift 65 P N 5900010 Rev B June 2022 ...
Страница 66: ...SP 7XE F Full Rise Scissor Lift 66 P N 5900010 Rev B June 2022 Maintenance Log ...
Страница 68: ...1645 Lemonwood Drive Santa Paula CA 93060 USA 2022 by BendPak Inc All rights reserved bendpak com ...