
SP-7XE/F Full-Rise Scissor Lift
15
P/N 5900010 — Rev. B — June 2022
36.
Install a Thermal Disconnect Switch
. A Thermal Disconnect Switch automatically shuts
down the Lift in the event of an overload or an overheated motor. Refer to
Tools
You may need some or all of the following tools:
•
Rotary Hammer Drill or similar
•
3/4", 3/8", 1 1/4" Masonry Drill
Bits
•
Hammer
•
Open-end Wrench set: 1/2",
15/16" – 1 1/8"
•
Socket and ratchet set, 1 1/8"
•
Medium adjustable wrench
•
Crow Bar
•
Chalk line
•
Medium flat screwdriver
•
Tape measure (25-foot
recommended)
•
Forklift or Shop Crane
Select a Site
Keep the following in mind when selecting a site for your Lift:
⚠
DANGER
Risk of explosion
. This equipment has internal arcing or sparking parts which
should not be exposed to flammable vapors.
•
Clearance
. You must have adequate space on all sides, plus enough space above for the
Vehicles you will be raising. See
•
No overhead obstructions
. The site must be free of overhead obstructions.
•
Operator
. The operator at the Console
must
have a full, unobstructed view of the SP-7XE.
•
Console
. The Console must be positioned near the Lift; the Hydraulic Hoses that are supplied
with the SP-7XE models support up to 40 inches between the Lift and the Console.
•
Concrete specifications
. Do not install the Lift on cracked or defective Concrete. Make sure
the Concrete is at least 4.25 inches thick, 3,000 psi, and cured for at least 28 days (if newly
poured). Make sure the floor is defect-free, dry, and level. Note that for Flush-Mount models
require a greater depth of concrete; there must be 4.25 inches of Concrete
below the bottom
of the Concrete Cutout
. If you intend to run the Hydraulic and Air Lines to some location
further than 40 inches from the Lift, consult with your Concrete Specialist to determine the size,
depth, and location of the conduits needed for the Hydraulic and Air Lines.
•
⚠
WARNING
Do not install the Lift on a surface with 3° of slope or more. A slope in
excess of 3° could lead to property damage, personal injury, or death; the slope makes the Lift less
stable, which could lead to Vehicles falling off of it.
•
Power
. You will need a 208 to 240 VAC power source available near the Console. Use a 25 amp
or greater fuse for a 230 VAC, 1 phase circuit. If you intend to run the electrical power out to the
Console under New Pour Concrete, consult with a licensed, certified Electrician to ensure the
correct location, depth, size and type of electrical conduit are installed according to national and
local codes.
•
Operating temperature
. The Lift is designed to be used between temperatures of 41º to 104ºF
(5º to 40ºC).
Содержание SP-7XE
Страница 56: ...SP 7XE F Full Rise Scissor Lift 56 P N 5900010 Rev B June 2022 Labels ...
Страница 57: ...SP 7XE F Full Rise Scissor Lift 57 P N 5900010 Rev B June 2022 ...
Страница 58: ...SP 7XE F Full Rise Scissor Lift 58 P N 5900010 Rev B June 2022 Parts Diagrams ...
Страница 59: ...SP 7XE F Full Rise Scissor Lift 59 P N 5900010 Rev B June 2022 ...
Страница 60: ...SP 7XE F Full Rise Scissor Lift 60 P N 5900010 Rev B June 2022 ...
Страница 61: ...SP 7XE F Full Rise Scissor Lift 61 P N 5900010 Rev B June 2022 ...
Страница 62: ...SP 7XE F Full Rise Scissor Lift 62 P N 5900010 Rev B June 2022 ...
Страница 63: ...SP 7XE F Full Rise Scissor Lift 63 P N 5900010 Rev B June 2022 ...
Страница 64: ...SP 7XE F Full Rise Scissor Lift 64 P N 5900010 Rev B June 2022 ...
Страница 65: ...SP 7XE F Full Rise Scissor Lift 65 P N 5900010 Rev B June 2022 ...
Страница 66: ...SP 7XE F Full Rise Scissor Lift 66 P N 5900010 Rev B June 2022 Maintenance Log ...
Страница 68: ...1645 Lemonwood Drive Santa Paula CA 93060 USA 2022 by BendPak Inc All rights reserved bendpak com ...