STEP 4
(Installing Jack on Rail)
1. Lower the Rolling Bridge Jack all the way down.
2. Using a shop crane, forklift or other lifting device raise
the Rolling Bridge Jack and place it in between the
Runways. (See Fig. 4.1)
3. Lower the Rolling Bridge Jack to just above the Utility
Rails on the inside of the Runways.
4. Adjust the Rolling Bridge Jack arms to the correct
width. (See Fig. 4.2)
NOTE: 18-25K models do not have adjustable arms.
5. When the desired width is reached. Lower the
Rolling Bridge Jack into the Utility Rails. Double check
that the Rollers are seated properly in or on the Utility
Rails. (See Fig. 4.3 & 4.4)
6. Ensure that the Utility Rail Channel is clean of debris,
tools etc.
7. Repeat the process for the other Rolling Bridge Jack
if installing in pairs.
8. Raise the lift up off the ground so that the Rolling
Bridge Jack is off the ground and lower the lift onto the
fi
rst safety stop.
ENSURE THAT THE LIFT IS RESTING ON THE
SAFETIES BEFORE PROCEEDING.
9. Check the clearance and movement of the Rolling
Bridge Jack by sliding the Rolling Bridge Jack forward
and rearward on the rails. Check that the Rollers are
centered on the Rails at all points along the rail’s length.
Adjustment of the Rolling Bridge Jack Arms or the
Runway width may be necessary to assure proper
operation.
WARNING!
When removing or moving the Rolling Bridge Jack
from shipping pallet pay close attention as the Jack
may move and can cause injury.
Prior to removing the strapping or bolts make sure
the Jack is held securely by a fork lift or some other
heavy lifting device.
Fig. 4.1
Fig. 4.2
Fig. 4.3
Fig. 4.4
Содержание RJ-12
Страница 2: ...2 This page intentionally left blank...
Страница 10: ...10 Fig 3 2...
Страница 16: ...16...
Страница 20: ...20...