17
8. Route the cable ends through the ends of each cross-
tube, over the SLACK SAFETY SHEAVE then to the top
of each column. Secure using the M18 hex nuts and flat
washers. Tighten each nut until there is at least 3/4” of
threading protruding through the top of the nut. The cables
will remain loose until start up and final cable adjustments
are made. (See Fig. 7.15 - 7.16)
9. After routing the cables, make sure all cables are
properly positioned and REMAIN WITHIN THE GROOVES
of ALL Sheaves. (See Fig. 7.17 - 7.18)
STEP 8
(Mounting the Hydraulic Power Unit)
1. Mount the
POWER UNIT to the Mounting Bracket
using the Hex Bolts and Nylock nuts. Then FILL THE
RESERVOIR
with 21 quarts of 10-WT hydraulic oil or
Dexron III automatic transmission fluid. (
See Fig. 8.1)
Route lifting
cable in front
of slack safety
sheave as shown
Fig 7.15
Fig 7.16
Install each
cable nut with a
MINIMUM of 3/4”
of thread exposed
Sheave
Cable
Fig 7.17
NOTE: ALL cables MUST remain in their
sheave grooves. Before lift start-up check all
cables for proper routing.
Fig 7.18
DANGER!
LIFTING CABLES ROUTED THROUGH THE CROSSTUBES
MUST RUN BELOW THE CROSSTUBE MOUNTING BOLTS.
SERIOUS DAMAGE OR INJURY CAN OCCUR IF CABLES
ARE NOT ROUTED CORRECTLY.
DANGER !
FAILURE TO ROUTE LIFTING CABLES AS DESCRIBED
MAY LEAD TO SERIOUS PERSONAL INJURY AND/OR
DEATH TO OPERATOR OR BYSTANDER AND/OR MAY
CAUSE DAMAGE TO PROPERTY.
Fig 8.1
M8 Hex
Bolts
M8 Nylock
Nuts
Flat
Washers
Содержание HD-9AE
Страница 23: ...23 ...
Страница 30: ...30 Adapter Plate Required for HD 9 12 14 HDS 14 Adapter Plate Required for HD 9 12 14 HDS 14 ...
Страница 42: ...42 ...
Страница 43: ...43 ...
Страница 44: ...44 ...
Страница 45: ...45 ...
Страница 46: ...46 ...
Страница 47: ...47 ...
Страница 50: ...50 ...
Страница 51: ...51 ...