background image

8

OPERATION & LEAKAGE TESTS 

(REFER TO 

THE TROUBLESHOOTING CHART IN THIS 

MANUAL)

For additional information 

see video BW2327

 – available 

through the Document Library on bendix.com.

1.  Check  all  lines  and  fittings  leading  to  and  from  the 

air dryer & reservoir system for leakage and integrity.  

Repair any leaks found.

2.  Build up system pressure to governor cut-out and note 

that the Bendix

®

 AD-IS

®

 air dryer purges with an audible 

escape of air. Watch the system pressure and note the 

pressure fall-off for a ten minute period.  If pressure 

drop exceeds – a) for a single vehicle: 1 psi/minute from 

either service reservoir; or b) for tractor trailer: 3 psi/

minute from either service reservoir – inspect the vehicle 

air systems for leak sources and repair them.  

Refer to 

Symptoms 1 and 4 in the Troubleshooting Chart.

 

3. 

Be sure to wear safety glasses in case of a 

purge blast. 

Check for excessive leakage around  

the purge valve with the compressor in the charge mode 

(compressing air).  Apply a soap solution to the purge 

valve exhaust port and observe that leakage does not 

exceed a 1" bubble in one second.  If any leakage 

exceeds the maximum specified, 

refer to Symptom 4 

in the Troubleshooting Chart.

4.  Build up system pressure to governor cut-out and note 

that the AD-IS air dryer purges with an audible burst of 

air, followed immediately by air flowing out of the purge 

valve.  

See Table 2 for the time required for the entire 

contents of the purge reservoir of a Bendix AD-IS air 

dryer & reservoir system to flow through the desiccant 

drying bed.

  Fan the service brakes to reduce system 

air pressure to governor cut-in.  Note that the system 

once again builds to full pressure and is followed by a 

purge. If the system does not follow this pattern, 

refer 

to Symptoms 5 and 6 in the Troubleshooting Chart

.

5.  Check the operation of the end cover heater and 

thermostat assembly during cold weather operation as 

follows:

A.  Electric Power to the Dryer (

Refer to Figure 4.

)

  With the ignition or engine kill switch in the RUN 

position, check for voltage to the heater and 

thermostat assembly using a voltmeter or test light.  

Unplug the electrical connector at the air dryer & 

reservoir system and place the test leads on each 

of the connections of the female connector on the 

vehicle power lead.  If there is no voltage, look for a 

blown fuse, broken wires, or corrosion in the vehicle 

wiring harness.  Check to see if a good ground path 

exists.

Figure 4 - Heater and Thermostat Connector

Heater & 

Thermostat 

Connector

B.  Thermostat and Heater Operation
 

Note: 

These tests are not possible except in cold 

weather operation.

  Turn off the ignition switch and cool the thermostat 

and heater assembly to below 40°F.  Using an 

ohmmeter, check the resistance between the 

electrical pins in the air dryer & reservoir system 

connector half.  The resistance should be 1.5 to 3.0 

ohms for the 12 volt heater assembly, and 6.0 to 9.0 

ohms for the 24 volt heater assembly.

  Warm the thermostat and heater assembly to 

approximately 90°F and check the resistance 

again. The resistance should exceed 1000 ohms. 

If the resistance values obtained are within the 

stated limits, the thermostat and heater assembly is 

operating properly.  If the resistance values obtained 

are outside the stated limits, replace the heater and 

thermostat assembly.

6.  Pressure Protection Valves.  Observe the pressure 

gauges of the vehicle as system pressure builds from 

zero.  The primary or secondary gauge should rise until 

it reaches approximately 106 psi (±6 psi), then level 

off (or a momentary slight fall) as the next pressure 

protection valve opens – supplying its reservoir.  When 

that pressure gauge passes through approximately 106 

psi (±6 psi) there should be an associated leveling off (or 

momentary slight fall) of pressure as the third and fourth 

pressure protection valves open. Then the primary and 

secondary gauges should increase together until they 

reach their full pressure of approximately 130 psi (±5 

psi).

Содержание SD-08-2418

Страница 1: ...or Exhaust 23 AUX 2 Auxiliary Delivery Port Pressure Protection Valves 4 Purge Valve RES Governor Reservoir 2 Figure 1 Bendix AD IS AD IS PuraGuard Oil Coalescing Air Dryer Reservoir Systems Desiccant...

Страница 2: ...the electrical system in a manner that safely removes all electrical power from the vehicle Never exceed manufacturer s recommended pressures Never connect or disconnect a hose or line containing pres...

Страница 3: ...essure protection valves is to protect each reservoir from a pressure loss in the other reservoir or a pressure loss in an air accessory Each of the pressure protection valves in theAD ISair dryer res...

Страница 4: ...as adsorption Dry air exits the desiccant cartridge through the center of the base assembly then flows to the delivery check valve through an orifice and into the purge reservoir The delivery check va...

Страница 5: ...ck Valve open Primary Port PRI Purge Valve Open Turbo Cut Off Valve Closed Engine Turbo Unloader Port Supply Port Primary Reservoir Pressure Protection Valves Exhaust Safety Valve Purge Reservoir Drai...

Страница 6: ...ve housing With the turbo cut off valve seated in the closed position air in the compressor discharge line as well as the AD IS air dryer inlet port cannot enter the air dryer By completing these acti...

Страница 7: ...oo close to the air compressor For assistance contact the Bendix TechTeam at 1 800 AIR BRAKE 1 800 247 2725 option 2 or bendix com D In areas where more than a 30 degree range of temperature occurs in...

Страница 8: ...cold weather operation as follows A Electric Power to the Dryer Refer to Figure 4 With the ignition or engine kill switch in the RUN position check for voltage to the heater and thermostat assembly us...

Страница 9: ...vailable for the servicing of the pressure protection valves Do not attempt to adjust or service the pressure protection valves incorrect pressure protection valve settings can result in the automatic...

Страница 10: ...s not build use the following procedure to remove clean and reinstall the delivery check valve DELIVERY CHECK VALVE CLEANING PROCEDURE Note This is only required if system pressure does not build afte...

Страница 11: ...for corrosion and replace as necessary ASSEMBLY 1 Lubricate the smaller o ring and check valve body with a heavy duty lithium grease 2 Install this o ring on the check valve body by sliding the o ring...

Страница 12: ...12 NOTES...

Страница 13: ...governor cut out and allow a full minute for the normal dryer purge cycle to empty the purge reservoir Switch off the engine and apply and release the brakes so that the system pressure reaches gover...

Страница 14: ...Air dryer not purging F Refer to Symptom 6 G Purge air exhaust time is insufficient due to excessive system leakage G Refer to Symptom 1 3 Safety valve on the air dryer is popping off or exhausting a...

Страница 15: ...air dryer purge valve exhaust may look like whitish liquid or paste or small beads A Faulty dryer cartridge A Replace the Bendix AD IS air dryer cartridge or AD IS air dryer B Excessive dryer vibrati...

Страница 16: ...007 2018 Bendix Commercial Vehicle Systems LLC a member of the Knorr Bremse Group 04 18 All Rights Reserved Log on and Learn from the Best On line training that s available when you are 24 7 365 Visit...

Отзывы: