Installation, connection and commissioning CP9xx-Kit
20
CP9xx-Kit_D00399_00_M_XXEN/07.2019
4.6 Commissioning of the CP9… device
1. Switch on the supply voltage: After switching on, the device performs a start routine. It is completed
when the commissioning page appears n the display.
Abb. 4.5: Commissioning page CP9xx device
2. Enter the desired IP address in the 1st line
3. Enter the subnet mask in the 2
nd
line
4. Enter the address of the default gateway.
5. Press the "Save" button to store the entries.
6. Wait 8-10 seconds.
Содержание B95061094
Страница 8: ...Important information 8 CP9xx Kit_D00399_00_M_XXEN 07 2019...
Страница 10: ...Safety instructions 10 CP9xx Kit_D00399_00_M_XXEN 07 2019...
Страница 14: ...Product description 14 CP9xx Kit_D00399_00_M_XXEN 07 2019...
Страница 22: ...Installation connection and commissioning CP9xx Kit 22 CP9xx Kit_D00399_00_M_XXEN 07 2019...