background image

8

Installation 

Fire Preparation 

continued…….

200820

Diagram 5

Diagram 6

Locate the 

LED Downlight Kit (Box B) 

and the 

Downlight 

Extension Cable and Instruction. (Inside Box A).

Note: Before proceeding further ensure the Tabs on the 
2 x Support Brackets are bent up over and facing 
inwards slightly. See Diagram 6.

Discard

the 

2 Light Led Kit With Sensor Instruction  

(Inside Box B) 

and instead follow the 

2 Light Led Kit With 

Sensor Instr 2M Extension Cable Instruction 
(Inside Box A) 

and proceed to install the 

LED Downlights, 

2M Extension Cable 

and 

Sensor Switch 

as detailed.

Note: The Sensor Switch can be installed in the left Or 
Right 

Support Bracket

.

Note: Later during the installation, when the fire is 
installed into the surround base, all the excess cables 
should be positioned to the Sensor Switch side of the 
installation, this will aid with servicing, in the unlikely 
event a defect occurs.

Depending on the model purchased:

050164 

(1000-3SL) - Fix the supplied 

2 x Magnet 

Support Brackets 

to the base of the fire using the 

previously removed 

4 x Screws

See Diagram 5.

050172

(1250-3SL) - Fix the supplied 

3 x Magnet 

Support Brackets 

to the base of the fire using the 

previously removed 

6 x Screws

See Diagram 5.

Note: The holes left in the top of each Magnet Support 
Bracket will be used in a later procedure.

Tabs

Once all the supplied brackets have been fixed to the 
fire, please proceed to the next stage of the installation 
process -

Stud Wall / Masonry Wall Installation.

Note: Place the fire safely to one side away from the 
installation site, to avoid it being damaged before 
being installed, later in the installation process.

Diagram 7

Содержание Arteon Pryzm 10003SL

Страница 1: ...1 54 64 Verdant Marble Suites To Suit 1000 3SL 1250 3SL Arteon Fires Instructions for Installation R1 SEPT 2021 200820 ...

Страница 2: ...nstallation Introduction Installation Fire Preparation 6 Installation Fire Preparation continued 7 8 Installation Pre fabricated Wall Masonry Wall 9 10 Installation Assembled Base 11 Installation Fire 12 Installation Assembled Top 13 Maintenance 14 Troubleshooting 15 200820 ...

Страница 3: ...3SL 64 Verdant Marble Floor Standing 8 1520 196 856 221 1620 Note The Arteon Fire and Verdant Marble Surrounds are supplied separately Light Assembly of the Arteon Fire the Verdant Surrounds is required Please follow the steps detailed on the following pages Fire Visible Glass Area mm F G H ARTEON PRYZM 5D 1000 3SL 995 380 140 ARTEON PRYZM 5D 1250 3SL 1245 380 165 200820 ...

Страница 4: ...ed LED Mood Light Set 830mm Fly Lead Fixing Kit Bagged to the inside of the surround Also supplied with 062944 are 2 x smaller boxes containing the following Box A 063010 Quantity Description 1 Marble Surround Installation Instruction 2 Support Brackets LH RH 2 Vertical Trim Sides LH RH 2 Horizontal Trim Sides LH RH 1 Plinth Overlay 2 Magnet Support Bracket 2 Magnets 2 No 4 X 5 8 2 8mm x 12 7mm Sc...

Страница 5: ...de Fire 3 Bags of Grey Slate Large Box Inside Fire 1 Fire Operating Instructions P17 24 Box 050172 1250 3SL Quantity Description 1 Assembled Marble Top 1 Assembled Marble Base with pre installed LED Mood Light Set 830mm Fly Lead Fixing Kit Bagged to the inside of the surround Also supplied with 063045 are 2 x smaller boxes containing the following Box A 063061 Quantity Description 1 Marble Surroun...

Страница 6: ...Note The surround and fire are a two adult person lift A second person will be required to lift and support the surround and fire during installation 200820 Installation Fire Preparation Diagram 1 Small Box Large Box Preparing the fire See the separate Fire Instructions Depending on the version purchased locate the box containing the Fire 050164 or 050172 and locate the separate Fire Operating Ins...

Страница 7: ...tical Side Trims LH RH Note These are boxed separately with the surround Box A Using the 14 x Screws previously removed fix the supplied brackets to the fire using 7 x Screws per side See Diagram 3 RH Support Bracket RH Vertical Side Trim RH Horizontal Side Trim Depending on the model purchased 050164 1000 3SL remove the 2 x Brackets attached to the base of the fire place the 4 x Screws safety to ...

Страница 8: ...o the surround base all the excess cables should be positioned to the Sensor Switch side of the installation this will aid with servicing in the unlikely event a defect occurs Depending on the model purchased 050164 1000 3SL Fix the supplied 2 x Magnet Support Brackets to the base of the fire using the previously removed 4 x Screws See Diagram 5 050172 1250 3SL Fix the supplied 3 x Magnet Support ...

Страница 9: ...as been made See Diagram 9 showing the slot centres of the support brackets Note The fire requires to be partially inset into a Pre fabricated Wall or Masonry Wall The minimum rebate required is 110mm this allows for the required 10mm clearance at the rear of the fire See Diagram 8 Pre Fabricated Wall Shown Masonry Wall Shown Diagram 8 Diagram 9 This product has been designed to be installed into ...

Страница 10: ...wn draughts and falling debris which could restrict and alter the airflow of the product which may cause the safety cut out system in the fan heater to operate The product should never be sealed into an opening with the use of silicones or adhesives as this can also alter the airflow and hinder any future servicing of the product It is essential to include a header lintel at the required height to...

Страница 11: ...se away from the wall and proceed with marking the 2 x Wall Brackets fixing positions on the wall Brackets bagged with the surround Set the bottom edge of the 2 x Wall Brackets 30mm down from the previously drawn line Once marked drill the fixing positions Depending on the wall medium it may be necessary to plug the drilled holes See Page 14 Important Note Finally screw and secure the 2 x Wall Bra...

Страница 12: ...perating correctly Note When lifting the fire into position care must be taken not to crush or damage the cables Diagram 19 Diagram 16 Once in position mark the position of the 6 x fixing points 3 per side in the Support Brackets Note When marking the fixing points ensure the 2 x Support Brackets are pushed tight against the wall and the side of the Fire Once marked remove the fire and drill the f...

Страница 13: ... Once centralized create a pilot hole though the fixing points on the 2 X Support Brackets into the underside of the Assembled Top 2 x Pilot Holes per side Note Use the correct drill size for the screw provided See Diagram 21 Using the No 4 X 5 8 2 8mm x 12 7mm Screws supplied fix the Assembled Top to the 2 x Support Brackets 2 x Screws per side See Diagram 21 Diagram 21 Next depending on the mode...

Страница 14: ...g products are not recommended Fingerprints or other marks on the front glass panel can be removed by a piece of soft damp lint free cloth with a good quality household glass cleaner The front glass panel should always be completely dried with a clean lint free cloth or paper towel CAUTION Abrasive cleaners should not be used on the glass panel Liquids should not be sprayed directly onto any surfa...

Страница 15: ...parate Fire instructions Page 17 24 Why have I been provided with 2 x Extension Leads for the downlight installation The smaller extension lead 1m is not required for this installation discard and proceed with the installation using the longer extension cable 2m Are wall fixings included Wall fixings i e screws wall plugs etc are not supplied as these are crucially dependent upon the type of wall ...

Отзывы: