![Belshaw Brothers TZ17 Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/belshaw-brothers/tz17/tz17_operators-manual-and-technical-supplement_2730399012.webp)
Belshaw Bros., Inc.
•
www.belshaw.com
•
Phone 206-322-5474
•
Fax 206-322-5425
2
MN-1258EN
Thermolizer TZ6 & TZ17 TS
Note: due to vibration in shipping, the door
handles might get out of adjustment. To
adjust door handles: loosen the screws which
fasten the handle to the Plexiglas door, adjust
position of the handle so it just clears the
bottom of the door above when both are
closed, and tighten the screws. If more than
one door handle requires adjustment, start
with the one nearest the top of the proofer and
work down.
12.
Turn the control box power switch to the off
position (see Operation Instructions)
13.
Connect Thermolizer cord to power source
provided from the ThermoGlaze main power
box. Mail the attached warranty registration
form within ten days of installation.
14.
Keep this manual for future reference. Put it
where you know you can find it.
Initial Cleaning
Remove all the packing materials. Wipe the
Thermolizer with a soft, damp cloth. Dry these
areas completely.
WARNING
To avoid electrocution or other injury, turn
off the machine’s main power before
attempting any cleaning, disassembly,
adjustment, or repair.