background image

6

Bell

 res

English

Installation instructions 

Содержание Tunnel 3

Страница 1: ...CAL BELL MEDIUM TUNNEL 3 Gas re with closed combustion system Bell res wishes you many cosy evenings with your new Bell res gas re This document is an essential part of your gas re Read it carefully b...

Страница 2: ......

Страница 3: ...3 Bell res English Instructions for use BELLFIRES GAS FIRE WITH CLOSED COMBUSTION SYSTEM Vertical Bell Medium Tunnel 3 VBMT3...

Страница 4: ...4 Bell res English Instructions for use...

Страница 5: ...5 Bell res English Instructions for use CONTENTS Page 1 WARRANTY TERMS 7 2 INSTRUCTIONS FOR USE 9 3 USING THE APPLIANCE FOR THE FIRST TIME 20 4 DAILY MAINTENANCE 20 5 ANNUAL MAINTENANCE 21...

Страница 6: ...6 Bell res English Instructions for use...

Страница 7: ...mponent parts Note The following aspects are not covered under the terms of the warranty defects arising which are attributable in whole or in part to a Not paying due heed to installation operating a...

Страница 8: ...8 Bell res English Instructions for use...

Страница 9: ...he tter 2 2 1 Safety Do not place embers vermiculite granules wood logs or pebbles against the pilot light burner Make sure that the pilot ame can burn at all times freely over the main burner Only in...

Страница 10: ...or added to Do not place easily ammable materials such as nylon clothing or ammable liquids in the vicinity of the gas re Ensure at all times that children and other people who are not aware of the o...

Страница 11: ...r are powered by batteries Hand held transmitter 1x 9V battery Receiver 4x 1 5V battery type LR6 or AA Option 6V adapter 230 VAC Available from your tter Note Hand held transmitter and receiver are no...

Страница 12: ...to return to mode Important Setting up signal code before using the appliance for the rst time Before the appliance can be used the receiver must rst learn the hand held transmitter s signal code Pres...

Страница 13: ...nd held transmitter is pressed except the SET button the transmission symbol appears on the screen The receiver con rms the transmission with an audio signal Operating day temperature thermostat Appli...

Страница 14: ...The appliance works thermostatically at the pre set stopping times P1 and P2 and the room temperature is automatically regulated to the pre set night temperature In order to allow the appliance to re...

Страница 15: ...on the gas control block to the I position Turn the operating knob on the gas control block to the ON position Switch the hand held transmitter to the position On the hand held transmitter press the O...

Страница 16: ...osition 5 short beeps Ignition of the pilot light and main burner failed Possible cause air in the pilot light pipe Important If the pilot ame goes out then wait for at least 5 minutes before repeatin...

Страница 17: ...ilot light Press the O I switch on the gas control block to the O position This conserves battery life If the appliance is not to be used for some time please close the gas supply valve in the gas pip...

Страница 18: ...end of the compartment Close the cover and place the receiver back in its holder If the batteries are inserted incorrectly the electronics or drive may be irreparably damaged Only replace the batterie...

Страница 19: ...s before repeating the above procedure Move the operating knob to the ON position Depending on the position of the motor knob the burner will either ignite or not By turning the motor knob anti clockw...

Страница 20: ...sits from behind the white panel door operating unit by means of a vacuum cleaner Important Regularly clean the glass on the inside of the appliance with glass spray or ceramic hob cleaner This also a...

Страница 21: ...he complete concentric ue system where possible and the outlet are cleaned and inspected annually by a recognised tter gas specialist The safe operation of the appliance will thus remain guaranteed Pl...

Страница 22: ...22 Bell res English Instructions for use...

Страница 23: ......

Страница 24: ...01 150512 332114 INTERFOCOS B V HALLENSTRAAT 17 5531 AB BLADEL NEDERLAND E mail info interfocos nl Internet www interfocos com...

Страница 25: ...DIUM TUNNEL 3 Gas re with closed combustion system Bell res wishes you many cosy evenings with your new Bell res gas re This document is an essential part of your gas re Read it carefully before insta...

Страница 26: ......

Страница 27: ...3 Bell res English Installation instructions BELLFIRES GAS FIRE WITH CLOSED COMBUSTION SYSTEM Vertical Bell Medium Tunnel 3 VBMT3...

Страница 28: ...4 Bell res English Installation instructions...

Страница 29: ...3 FAULTS 68 4 DISMANTLING ASSEMBLING OF THE GLASS 69 5 ELECTRICAL DIAGRAM 75 6 DIMENSIONS 76 7 TECHNICAL DETAILS REGULATIONS 83 8 REPLACEMENT PARTS LIST 85 9 DISPOSAL OF PACKAGING AND APPLIANCE 87 Th...

Страница 30: ...6 Bell res English Installation instructions...

Страница 31: ...ombustion air It is possible to install the gas re with either a wall or roof outlet The roof connection must be carried out using the concentric ue system 100 mm 150 mm The fumes are exhausted natura...

Страница 32: ...for a wood or coal re then it should be cleaned by an expert 1 2 CONCENTRIC FLUE SYSTEMS 100 MM 150 MM AND 130 MM 200 MM Bell res Muelink Grol system Poujoulat PGI system Ontop Metaloterm US system T...

Страница 33: ...onvection exit grid white 145 x 145 mm 309730 2x Collar adaptor 125 mm 304040 4x Hose clamp 125 mm 329874 Set carrying brackets 2 pieces 3 Bell res M G concentric ue system See component summary 3 Pou...

Страница 34: ...for correct operation Roof mounted outlet Figure 1 Roof mounted outlet This must be positioned at least 0 5 m from the roof edge the apex of the roof can be disregarded Wall mounted outlet Figure 2 W...

Страница 35: ...ving an occupied room a toilet or a bathroom B A heating air supply when the supply ows through an occupied room C A window that can be opened and that is near an occupied room a toilet or a bathroom...

Страница 36: ...all 2 m if the distance from the facing wall is less the criteria detailed for On a wall general apply Enquire at your local gas company for the regulations relating to outlets positioned opposite eac...

Страница 37: ...of the outer walls approx 150 C no ammable materials may be located or used in the vicinity of the ue system The complete ue system must therefore be sleeved with a heat resistant material after assem...

Страница 38: ...CONCENTRIC FLUE 100 mm 150 mm SYSTEM CONNECTION POSSIBILITIES Appliance Concentric ue connection 100 150 mm or 130 200 mm Item descriptions see 1 6 2 Assemble restriction plate Appliance Distance Y C...

Страница 39: ...E LENGTH OF THE ROOF OR WALL TERMINATION 16 23 Y2 X 10 11 12 13 14 15 Y1 4 1 28 23 23 17 24 100 Item descriptions see 1 6 2 Assemble restriction plate Appliance Distance Y1 Distance X Distance Y1 Y2 C...

Страница 40: ...7 5 29 30 10 11 12 13 Y Item descriptions see 1 6 2 Assemble restriction plate Appliance Distance Y Concentric Concentric min max connection connection on appliance is on appliance is 100 150 mm 130 2...

Страница 41: ...2 to 1 ALL SIZES INCLUDE THE LENGTH OF THE ROOF OR WALL TERMINATION Y2 Y1 10 11 12 13 45 X Y3 32 18 30 29 5 7 29 26 25 23 28 4 1 100 Item descriptions see 1 6 2 Assemble restriction plate Appliance D...

Страница 42: ...INCLUDE THE LENGTH OF THE ROOF OR WALL TERMINATION Y 7 6 8 18 32 31 29 30 29 26 29 27 28 29 4 1 100 Item descriptions see 1 6 2 Assemble restriction plate Appliance Distance Y Concentric Concentric m...

Страница 43: ...s always at least 2 to 1 ALL SIZES INCLUDE THE LENGTH OF THE ROOF OR WALL TERMINATION Y3 Y2 Y1 X 45 6 8 7 31 29 32 18 30 29 26 29 27 28 29 4 1 100 Item descriptions see 1 6 2 Assemble restriction plat...

Страница 44: ...ination Position 100 4 28 1 Y X 19 14 10 11 13 0 16 m Figure 10 Horizontal wall termination Item descriptions see 1 6 2 Assemble restriction plate Appliance Distance Y Distance X Concentric Concentric...

Страница 45: ...111 113 0 16 m Assemble restriction plate Appliance Distance Y Distance X Concentric connection on min max min max appliance is 130 200 mm 0 5 1 0 m 0 1 6 m Width B 40 mm Vertical Bell Medium Tunnel...

Страница 46: ...200 mm Assemble restriction plate Appliance Distance Y Distance X Concentric connection on min max min max appliance is 130 200 mm Vertical Bell Medium Tunnel 3 0 5 3 0 m 0 4 6 m Item descriptions se...

Страница 47: ...entric connection on min max min max min max min max appliance is 130 200 mm 0 0 5 m 0 0 5 m 0 5 1 0 m 0 0 6 m Vertical 0 5 1 0 m 0 0 5 m 0 0 5 m 0 0 6 m Bell Medium 1 0 3 0 m 0 1 0 m 0 5 2 0 m 0 0 6...

Страница 48: ...114 110 111 113 0 25 m 123 Wall Termination Position Appliance Concentric ue connection 130 200 mm RIGID CONCENTRIC FLUE 130 mm 200 mm SYSTEM CONNECTION POSSIBILITIES and with wall outlet 130 mm 200 m...

Страница 49: ...ipe L 500 mm incl and Twin wall balanced ue elbow 90 incl and BELLFIRES ART ORDER NO 302289 302290 302291 302292 302297 Color Application RVS antr RIGID FLEX l l l l l l l l l l FIG NO DESCRIPTION 1 G...

Страница 50: ...of ashing for existing chimney or at roof Horizontal wall termination kit L 600 mm horizontally adjustable incl and one set of wall spacer plates Stainless steel locking band 150 mm quick fastening Si...

Страница 51: ...150 mm ex Stainless steel locking band 150 mm For adapter 150 appliance 150 mm ex Screw fastening Stainless steel screws 3 5 mm x 9 5 mm For securing the exible concentric ue Minimum 3 screws per con...

Страница 52: ...IRES ART ORDER NO 302302 302303 321948 l l l l l l Color Application RVS antr RIGID FLEX Color RVS Stainless steel self colour polished antr Anthracite colour lacquer matt Adjustable roof ashing for a...

Страница 53: ...00 mm incl and Twin wall balanced ue pipe L 1000 mm incl and Adjustable length twin wall balanced ue pipe L 500 mm incl and Twin wall balanced ue elbow 90 incl and Twin wall balanced ue elbow 45 incl...

Страница 54: ...tainless steel adapter piece 200 from re to exible 198 mm external rigid x 198 mm internal ex appliance 200 mm ex Stainless steel locking band 200 mm For adapter 200 appliance 200 mm ex Screw fastenin...

Страница 55: ...ue pipe L 450 mm Twin wall balanced ue pipe L 950 mm Telescopic twin wall balanced ue pipe L min 390 mm max 640 mm Twin wall balanced ue elbow 90 Twin wall balanced ue elbow 45 POUJOULAT ART ORDER NO...

Страница 56: ...kit L 140 mm Roof ashing suitable for a brick roof with a roof pitch of 15 30 Roof ashing suitable for a tiled roof with a roof pitch of 15 30 Roof ashing suitable for a brick roof with a roof pitch o...

Страница 57: ...d ventilation grooves Set of ceiling nishing plates Fire stops suitable for a roof pitch of 0 10 Set of ceiling nishing plates Fire stops suitable for a roof pitch of 10 30 Set of ceiling nishing plat...

Страница 58: ...150 mm Adapter Bell res 100 150 mm Poujoulat PGI 100 150 mm Appliance 100 150 Poujoulat PGI 100 150 Adapter Bell res 130 200 mm Poujoulat PGI 100 150 mm Appliance 130 200 Poujoulat PGI 100 150 Concen...

Страница 59: ...111 112 114 115 POUJOULAT ART ORDER NO 37130403 37130404 37130405 37130429 37130441 37130421 DESCRIPTION Twin wall balanced ue pipe L 250 mm Twin wall balanced ue pipe L 450 mm Twin wall balanced ue p...

Страница 60: ...Ceiling wall plate with spacers and ventilation grooves Set of ceiling nishing plates Fire stops suitable for a roof pitch of 0 10 Set of ceiling nishing plates Fire stops suitable for a roof pitch o...

Страница 61: ...N Concentric pipe with inspection opening L 250 mm Roof support universal 200 mm Floor support universal 200 mm Adapter Bell res 130 200 mm Poujoulat PGI 130 200 mm Appliance 130 200 Poujoulat PGI 130...

Страница 62: ...ces with 100 150 mm concentric connection Twin wall balanced ue pipe L 250 mm Twin wall balanced ue pipe L 500 mm Twin wall balanced ue pipe L 1000 mm Telescopic twin wall balanced ue pipe L min 60 ma...

Страница 63: ...collar 150 mm Adjustable roof ashing Roof pitch 20 45 with lead ashing Roof ashing plate for roof pitch 5 30 Roof ashing for existing chimney or at roof Roof ashing Aluminium for existing chimney or a...

Страница 64: ...Locking band quick fastening Cover band screw fastening Wall strap adjustable Fitting bracket Set of ceiling nishing plates Fire stops Centring plates Roof support Renovation set Top of renovation se...

Страница 65: ...band screw fastening Concentric pipe with inspection panel L 250 mm Concentric pipe with gauging ori ce L 150 mm 90 concentric bend with inspection panel Rosette smooth 150 mm Wall plate large 150 mm...

Страница 66: ...130 200 mm concentric connection Twin wall balanced ue pipe L 250 mm Twin wall balanced ue pipe L 500 mm Twin wall balanced ue pipe L 1000 mm Telescopic twin wall balanced ue pipe L min 60 max 250 mm...

Страница 67: ...45 Twin wall balanced ue elbow 30 Twin wall balanced ue elbow 15 Vertical roof termination kit L 375 mm incl Storm collar 150 mm Adjustable roof ashing Roof pitch 20 45 with lead ashing Roof ashing p...

Страница 68: ...uminium for existing chimney or at roof Horizontal wall termination kit L 475 mm horizontally adjustable incl Locking band quick fastening Cover band screw fastening Wall strap adjustable Fitting brac...

Страница 69: ...TION Roof support Renovation set Top of renovation set Bottom renovation set Locking band screw fastening Concentric pipe with inspection panel L 250 mm Concentric pipe with gauging ori ce L 150 mm ON...

Страница 70: ...et Concentric reduction of 130 200 mm 100 150 mm ONTOP ART ORDER NO USBI 13 USR 13 USMPG 13 ASAH 13 USVG 13 10 The room sealed gas appliances have been approved in combination with the components of t...

Страница 71: ...mately 1 meter above the appliance for the warm air exiting grids 1 7 POSITIONING THE APPLIANCE Important The replace is constructed on a suf ciently solid oor that can bear the weight of the applianc...

Страница 72: ...as re a clearance of 3 mm should be maintained on all sides of the appliance to allow for expansion of the appliance during operation Do not insulate the appliance Only the top and sides may be tted w...

Страница 73: ...et opening appliance convection air 2 Inlet opening grate chimney breast convection air 3 Natural convection in the chimney breast 4 Outlet opening grate chimney breast natural convection air 5 Outlet...

Страница 74: ...n package 1 Inlet opening appliance convection air 2 Inlet opening grate chimney breast convection air 3 Natural convection in the chimney breast 4 Outlet opening grate chimney breast convection air 2...

Страница 75: ...of the oor of the combustion chamber The oor of the combustion chamber can be reached after the window and the grill around the burner have been removed see chapter 4 Using an Allenkey no 5 the appli...

Страница 76: ...em is outside the appliance the gas pipe must lead to where the operating unit built in the gas regulating block and the receiver assembly are tted The appliance may not be installed in a ammable wall...

Страница 77: ...50 cm from the appliance Connect the supplied 8 12 4 mm stainless steel exible gas pipe on one side under the burner plate with the compression coupling there The connections for the main burner 8 mm...

Страница 78: ...lating block and receiver in operating unit 1 Gas regulating block 2 Gas supply connection 3 8 12 mm insertion 3 Burner piping connection 8 mm insertion 4 Thermocouple connection M 10x1 mm insertion 5...

Страница 79: ...be tted Figure 20 Gas regulating block Remote control Side inlet Side outlet Bottom Outlet Bottom Inlet Inlet Pressure Tap Outlet Pressure Tap Thermo Unit Connection Minimum Rate Adjustment Screw Mot...

Страница 80: ...iezo cable the 8 terminal cable and the two thermocouple cables to the receiver see Chapter 5 Electrical Diagram Carefully move the bracket with the gas regulating block and piping towards the control...

Страница 81: ...d up the brickwork farther than the angle irons brackets keep in mind the thickness of any plastering Do not use masking tape on the appliance when installing and plastering Tape can damage the nish o...

Страница 82: ...le pebbles against the pilot light burner For that reason the main burner has a protective pilot light cowl Never remove this cowl Make sure that the pilot ame can burn at all times freely over the ma...

Страница 83: ...1 Place the ceramic mat on the burner in such a way that the holes in the mat are in line with the burner openings 2 Remove the embers carefully from their packaging and spread them evenly over the b...

Страница 84: ...ules must not be placed next to the pilot light burner Important make sure that all burner openings remain free Burner ori ces which are not open could lead to a dangerous situation 4 Place the logs o...

Страница 85: ...61 Bell res English Installation instructions Logs Log no Log no Log no Log no Log no Log no Log no Log no...

Страница 86: ...ight burner Embers must not be placed next to the pilot light burner Keep the burner ori ces unblocked Figure 23 Log set Vertical Bell Medium Tunnel 3 Position propane butane burner Keep the burner or...

Страница 87: ...rner openings 2 Spread the pebbles over the whole burner bed burner and grid around the burner Make sure that the pilot light remains free Vertical Bell Medium Tunnel 3 see gure 25 Figure 24 Marble pe...

Страница 88: ...this way a proper ignition of the main burner is ensured Once the logs marble pebbles have been positioned replace the glass in the appliance following the instructions in chapter 4 DISMANTLING ASSEM...

Страница 89: ...gas restriction plate is mounted Use of the correct ue gas restriction plate will provide optimum ef ciency ame effect and combustion Mounting an incorrect ue gas restriction plate can result in damag...

Страница 90: ...ld be short and blue yellow in colour These ames should gradually increase in height and become more yellow When all ames are yellow the gas re has reached the correct temperature THE GAS FIRE IS NOW...

Страница 91: ...these After cleaning Carefully replace the embers vermiculite granules logs set or pebbles on and around the main burner according to the installation directions in this instruction booklet Do not pl...

Страница 92: ...ontacts in the thermo electrical system for example the thermocouple connection Batteries in receiver or remote control are at 3 2 SAFETY MEASURES IN THE APPLIANCE 3 2 1 Thermo electric pilot light sh...

Страница 93: ...ling of the glass With the hook pull the thin metal spring strip on the top middle from the stud on the frame Note When loosening the frame and after it has been loosened sup port it with your hand to...

Страница 94: ...Bell res English Installation instructions Detail of the stud middle Place paperboard on the chimney breast under the frame This helps prevent damage stud middle Dismantle the safety strip from the fr...

Страница 95: ...front Check whether the frame is placed in the middle of the front Check whether the safety strip is securely fastened to the top of the frame middle The glass frame must t tightly all round to the ed...

Страница 96: ...Use the hook to pull the frame at the top forward and hold the frame rmly Use the hook supplied for opening the frame including glass 4 2 VERTICAL BELL MEDIUM TUNNEL 3 HIDDEN DOOR Dismantling of the g...

Страница 97: ...th the hook pull the thin metal spring strip on the top middle from the stud on the frame Note When loosening the frame and after it has been loosened support it with your hand to prevent it falling f...

Страница 98: ...of the glass The assembly of the glass takes place in reverse order Important Check whether the frame is properly positioned underneath in the 2 holes of the front Check whether the frame is placed in...

Страница 99: ...O I Switch RECEIVER Battery Compartment panel 4 AA Batteries cable 2 cable 1 red black SPARK SPARK SW TC SW TC GR SW MA MO Pilot ON OFF Switch Thermocurrent interrupter Block red Button Reset Motor k...

Страница 100: ...76 Bell res English Installation instructions 6 DIMENSIONS 6 1 VERTICAL BELL MEDIUM TUNNEL 3 6 1 1 VERTICAL BELL MEDIUM TUNNEL 3 2x Hidden Door...

Страница 101: ...77 Bell res English Installation instructions 6 1 2 VERTICAL BELL MEDIUM TUNNEL 3 2x Floating Frame...

Страница 102: ...78 Bell res English Installation instructions 6 1 3 VERTICAL BELL MEDIUM TUNNEL 3 1x Hidden Door 1x Floating Frame...

Страница 103: ...With the high adjustable feet option the appliance can be installed till 350 mm above the oor 6 2 VERTICAL BELL MEDIUM TUNNEL 3 Fitted with the options Convection top plate High adjustable feet 6 2 1...

Страница 104: ...80 Bell res English Installation instructions 6 2 2 VERTICAL BELL MEDIUM TUNNEL 3 2x Floating Frame With the high adjustable feet option the appliance can be installed till 350 mm above the oor...

Страница 105: ...ell res English Installation instructions 6 2 3 VERTICAL BELL MEDIUM TUNNEL 3 1x Hidden Door 1x Floating Frame With the high adjustable feet option the appliance can be installed till 350 mm above the...

Страница 106: ...82 Bell res English Installation instructions OPERATING UNIT...

Страница 107: ...output 8 1 kW 6 2 7 6 kW Ef ciency class 1 85 1 85 NOx class 5 5 Gas rate max 1 00 m3 s hr Butane G30 770 gr hr Propane G31 610 gr hr Supply pressure 20 0 mbar Butane G30 37 0 mbar Propane G31 37 0 mb...

Страница 108: ...el 111 kg 111 kg Including all options 117 kg 117 kg When the appliance has reached its thermal equilibrium Burner at maximum Appliance is cold Flue gas exhaust and combustion air supply Roof mounted...

Страница 109: ...Switch with short length of cable to thermocouple interrupter and long length of cable tc L 500 mm to receiver 15 326287 Hand held transmitter Display screen Temperature and two programmes 16 326288...

Страница 110: ...ell Medium Tunnel 3 Chips of Embers with Vermiculite no 4 wood set Glow effect black Anthracite ltered 1 331357 1x 2 331358 2x 3 331359 4 331360 1x 6 331362 1x 7 331363 8 331364 5 331361 3 pieces xxxx...

Страница 111: ...clude Cardboard Wood Plastic Paper Such materials must be disposed of responsibly in line with local regulations Batteries should be disposed of as chemical waste Batteries must be disposed of respons...

Страница 112: ...01 010912 332110 INTERFOCOS B V HALLENSTRAAT 17 5531 AB BLADEL NEDERLAND E mail info interfocos nl Internet www interfocos com...

Отзывы: