1
2
3
4
5
6
7
8
9
10
14
Installation
se
ct
io
n
2
Before You Begin:
1. Make sure that all computers are powered off and that each PRO2
PS/2 has been assigned a unique BANK address.
2. Place Master and Slave switches in the desired location. Make sure
all are turned off and unplugged from the power source.
3. Connect the Console monitor, keyboard, and mouse to the Console
ports of the Master switch or Bank 00, as described previously in
this installation guide.
Connecting the Master Switch to the First Slave Switch:
4. Using the daisy-chain cable (F1D108-CBL), connect one end of the
cable to the “Master Input/Slave Output” port on the Master switch
(BANK 00).
5. Connect the other end of the daisy-chain cable to the “Master
Input/Slave Output” port of the first Slave switch (BANK 01).
Adding Additional Slave Units:
6. Using the daisy-chain cable (F1D108-CBL), connect one end of the
cable to the available daisy-chain port labeled “Slave Input” on the
Slave switch (for example, BANK 01).
7. Connect the other end of the daisy-chain cable to the “Master
Input/Slave Output” port of the Slave switch that you are adding
(for example, BANK 02).
8. Repeat steps 6 and 7 for additional PRO2 PS/2s you wish to daisy-
chain together.