3
On/Off Buttons
– control for each of the corresponding rear
socket. Press and hold for 3 seconds to setup up the
Remote/local control for each of the corresponding rear
socket. If you installed an optional NT card inside the
ePowerSwitch, there is a delay time for the corresponding
outlet of the NT card to off the power for the safe shutdown
functionality. The default delay time is set up as 3 minutes.
RJ 11 Jacks
iLink Port
– Daisy chain to the another ePowerSwitch client
(without NIC).
Ring On/Reset Port
– Connect to telephone line for
telephone On/Reset control.
Communication Port
– Native support on Microsoft NT 4
and 2000 UPS driver. All ports are functional default.
Содержание ePowerSwitch F1D001
Страница 1: ...User Manual ePowerSwitch By BELKIN 34000179 19 Sep 02 Copyright 2000...
Страница 23: ...19 User Management Administrators canassign the maximum of4 users to control the outlet...
Страница 24: ...20 20 Software Update This is the place you can upgrade the firmware when it is available or bug fix...
Страница 27: ...23 Scheduled shutdown Scheduled shutdown can be accomplished here Be careful with which outlet you are working...
Страница 30: ...26 26 the user data are lost...